... to be sufficiently in detail to enable the Secretary of War to judge of the proper location of said bridge, and shall furnish such other information as may be required for the t'ulraud satisfactory understanding of the subject. Annual Reports of the War Department - Page 475by United States. War Department - 1891Full view - About this book
| United States. Army. Corps of Engineers - 1900 - 782 pages
...the banks of the river, the direction and strength of the currents at all stages, with the soundings accurately showing the bed of the stream, and the...proper location of said bridge, and shall furnish stich other information as may be required for a full and satisfactory understanding of the subject;... | |
| 1902 - 838 pages
...accurately showing the bed of the stream, and the location of any other bridge or bridges, such maps to be sufficiently in detail to enable the Secretary...such other information as may be required for a full understanding of the subject; and until any changes in the plan of the bridge are approved by the Secretary... | |
| United States. Army. Corps of Engineers - 1905 - 1062 pages
...the river, the direction and strength of the current at all stages of the water, with the soundings, accurately showing the bed of the stream and the location...sufficiently in detail to enable the Secretary of "U ar to judge of the proper location of said bridge, and shall furnish such other information as may... | |
| 1891 - 968 pages
...of the river, tlio direction and strength of the currents at all stages of the water, with soundings accurately showing the bed of the stream, and the...be sufficiently in detail to enable the Secretary cf War to jndgnof the proper location of said bridge, and shall furnish such other information us may... | |
| 1891 - 1248 pages
...river, the direction ami strength of the currents at all s.tagos of the water, with the soundings, accurately showing the bed of the stream, and the...location of any other bridge or bridges, such map to be snfflciently in detail to enable the Secretary of War to judge of the proper location of said bridge,... | |
| United States. Army. Corps of Engineers - 1894 - 650 pages
...of the river, the direction and strength of the currents at high and low water, with the soundings, accurately showing the bed of the stream, and the...location of any other bridge or bridges; such map to be in sufticient detail to enable the said Secretary of War to judge of the proper location of said bridge,... | |
| United States. Army. Corps of Engineers - 1893 - 1288 pages
...design and drawing of the bridge and a map of the location, giving such information as may be necessary to enable the Secretary of War to judge of the proper location of said bridge, and shall furnish such information as may be required for a full and satisfactory understanding of the subject; and until... | |
| 1891 - 1350 pages
...thereof the words "the direction and strength of the currents at all stages of the water, with soundings accurately showing the bed of the stream and the location of any other bridge or bridges, such maps to be sufficiently in detail to enable the Secretary of War to judge of the proper location of... | |
| 1899 - 532 pages
...shore lines at high and low water, the directions and strength of currents at all stages, and soundings accurately showing the bed of the stream, and the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding... | |
| 1898 - 604 pages
...shore lines at high and low water, the directions and strength of currents at all stages, and soundings accurately showing the bed of the stream, and the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding... | |
| |