Annual Reports of the War Department, Part 1U.S. Government Printing Office, 1876 |
From inside the book
Results 6-10 of 100
Page 50
... shoal between Lime Rock and Goat Island , where it was designed to increase the depth from 124 feet to 15 feet at mean low - water for a width of 300 feet . The material was , however , found so hard that a cut of only 45 feet in width ...
... shoal between Lime Rock and Goat Island , where it was designed to increase the depth from 124 feet to 15 feet at mean low - water for a width of 300 feet . The material was , however , found so hard that a cut of only 45 feet in width ...
Page 51
... shoal beyond the end of the jetty , and probably will continue so until the structure reaches beyond the crest of the bar and meets the deep water and strong littoral current occasioned by the Sound tidal currents . To complete this ...
... shoal beyond the end of the jetty , and probably will continue so until the structure reaches beyond the crest of the bar and meets the deep water and strong littoral current occasioned by the Sound tidal currents . To complete this ...
Page 60
... Shoals , and remove existing shoal points on the northern and western side of the channel . Next year it is proposed to continue the removal of shoal points along the easterly side of Bulkhead Channel , lower down the river . Amount ...
... Shoals , and remove existing shoal points on the northern and western side of the channel . Next year it is proposed to continue the removal of shoal points along the easterly side of Bulkhead Channel , lower down the river . Amount ...
Page 65
... Shoal permits ves- sels of 14 feet draught to leave the dock and proceed to sea . The shal- low reach below Rockett's Reef has been deepened and widened , and the channel over Richmond Bar has been increased in width 100 feet . A ...
... Shoal permits ves- sels of 14 feet draught to leave the dock and proceed to sea . The shal- low reach below Rockett's Reef has been deepened and widened , and the channel over Richmond Bar has been increased in width 100 feet . A ...
Page 69
... shoal northeast of Fort Pulaski by the United States dredging . steamer Henry Burden , giving an increase of width to the channel pre- viously established through that shoal . There seems to be a slight in- dication of shoaling in this ...
... shoal northeast of Fort Pulaski by the United States dredging . steamer Henry Burden , giving an increase of width to the channel pre- viously established through that shoal . There seems to be a slight in- dication of shoaling in this ...
Other editions - View all
Common terms and phrases
00 Amount act approved August Amount appropriated Amount available July Amount estimated appropriated by act approved August 14 bank beach boats bowlders breakwater bridge built canal Cape Fear River cents channel Chief of Engineers chord commenced completion of existing Congress construction continued contract Core Sound Corps of Engineers Creek cubic yards dike distance dredging ending June 30 excavation existing project expended during fiscal expended in fiscal feet at mean feet deep feet wide fiscal year ending gabions gauge harbor high-water improvement inches Inlet Island jetty June 23 Lake ledge length Lieut locks low water lower Major Merrill mean low-water miles Mississippi River Money statement mouth navigation obstructions pier portion profitably expended reef removed repairs required for completion riprap rock Saint Saint Mary's River sand shoal shore Sound Steamer stone survey thousand dollars tide timber tion Total upper vessels Warwick Bar width
Popular passages
Page 29 - No appropriation asked for next fiscal year. Batteries on Angel Island, San Francisco Harbor, California, in charge of Lieut. Col. CS Stewart, Corps of Engineers. — These three temporary earthworks, constructed during the late war, are essentially unserviceable. The platforms are decayed, and most of the carriages have been condemned.
Page 147 - ... and no bridge shall be commenced or built under this act until the location thereof and the plans and specifications for its construction shall have been submitted to and approved by the iSecretary of War; and any change...
Page 147 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river...
Page 23 - Pulaski, mouth of Savannah River, Georgia, in charge of Lieut. Col. QA Gillmore, Corps of Engineers. — This is the principal work for the defense of Savannah on the outer line of the system.
Page 16 - Corps of Engineers. — One of the great objects of this work is to prevent the occupation of the lower bay as an anchorage by an enemy's fleets.
Page 43 - Sea-wall on Point Allerton. — This wall was completed in May, 1874, together with a riprap apron-work for the protection of its foundation. Its total length is 1,202 feet. It is now in excellent condition in every respect, and fully answers the purpose intended.
Page 498 - The original project, as modified in 1883, provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water from the deep water above Red Bridge to the...
Page 143 - Proviso, locks, the Secretary of War shall take possession of and use the said lands, after having purchased the same, or, in case the said lands cannot be purchased for a reasonable price, then after having paid for the same, or secured the value thereof, which value may be ascertained in the mode provided by the laws of Oregon for the condemnation of lauds for public uses in that State.
Page 131 - ... approaches thereto, under and upon such terms and conditions as shall be prescribed by the Secretary of War, upon hearing the allegations and proofs of the parties, in case they shall not agree.
Page 437 - During the last week of May and the first week of June...