Annual Reports of the War Department, Part 1U.S. Government Printing Office, 1893 |
From inside the book
Results 6-10 of 100
Page 74
... repair of wing dams in 1886. Except the fixing and defining of the channel by wing dams , the results of the im- provement so far made have not been permanent . The funds on hand from previous appropriations are sufficient for such repairs ...
... repair of wing dams in 1886. Except the fixing and defining of the channel by wing dams , the results of the im- provement so far made have not been permanent . The funds on hand from previous appropriations are sufficient for such repairs ...
Page 92
... repair of decaying dikes and partly to dredging . At that date the dikes provided for in the project of improvement , so ... repairs of the dikes ; to the construction of new dikes ; to the removal of Overslaugh Rock above Van Wies Point ...
... repair of decaying dikes and partly to dredging . At that date the dikes provided for in the project of improvement , so ... repairs of the dikes ; to the construction of new dikes ; to the removal of Overslaugh Rock above Van Wies Point ...
Page 93
... repairs to existing dikes , construc- tion of new dikes , dredging at Mulls Cross - over and Austins Rock , and ... repairing the timber work of the south dike and refilling of both dikes with stone where settlement had taken place , and ...
... repairs to existing dikes , construc- tion of new dikes , dredging at Mulls Cross - over and Austins Rock , and ... repairing the timber work of the south dike and refilling of both dikes with stone where settlement had taken place , and ...
Page 94
... repairing the north branch and south dikes , by replacing worn and de- cayed timber and refilling with stone . The repairs were still in prog ress at the close of the fiscal year .. The improvement is in fair condition , but annual repairs ...
... repairing the north branch and south dikes , by replacing worn and de- cayed timber and refilling with stone . The repairs were still in prog ress at the close of the fiscal year .. The improvement is in fair condition , but annual repairs ...
Page 123
... repairing these piers , improving the harbor , and removing obstructions . No further appropriation was made until 1866 . At ... repairs are estimated to cost about $ 260 . The funds now available are sufficient for these and all other ...
... repairing these piers , improving the harbor , and removing obstructions . No further appropriation was made until 1866 . At ... repairs are estimated to cost about $ 260 . The funds now available are sufficient for these and all other ...
Contents
3 | |
11 | |
20 | |
26 | |
47 | |
53 | |
76 | |
92 | |
426 | |
427 | |
432 | |
439 | |
440 | |
447 | |
457 | |
458 | |
107 | |
126 | |
143 | |
148 | |
157 | |
174 | |
184 | |
191 | |
201 | |
212 | |
215 | |
228 | |
229 | |
238 | |
251 | |
252 | |
257 | |
258 | |
271 | |
279 | |
280 | |
285 | |
294 | |
296 | |
307 | |
308 | |
314 | |
320 | |
326 | |
328 | |
334 | |
343 | |
359 | |
363 | |
366 | |
377 | |
388 | |
395 | |
409 | |
415 | |
419 | |
421 | |
463 | |
465 | |
475 | |
478 | |
486 | |
498 | |
504 | |
509 | |
515 | |
519 | |
599 | |
627 | |
629 | |
635 | |
647 | |
665 | |
669 | |
708 | |
725 | |
739 | |
774 | |
800 | |
802 | |
809 | |
868 | |
897 | |
914 | |
950 | |
996 | |
1005 | |
1019 | |
1073 | |
1083 | |
1099 | |
1120 | |
1138 | |
Other editions - View all
Common terms and phrases
100 feet wide 1895 Submitted 50 feet act approved July act of March amount covered Amount estimated amount expended Appendix appropriated by act approved July 13 balance available balance unexpended Amount balance unexpended July breakwater bridge canal Chief of Engineers commenced completion of existing compliance with requirements Congress and printed construction Corps of Engineers covered by uncompleted Creek cubic yards dams deep at mean dikes division engineer dredging ending June 30 entrance estimated cost examination under date existing project expended during fiscal expended in fiscal expenditures feet at low fiscal year ending harbor acts House Ex Island jetty Lake mean low water miles Mississippi River mouth navigation obstructions piers printed as House profitably expended removal repairs required for completion requirements of sections riprap river and harbor rock Secretary Secretary of War September 19 shoals snags Submitted in compliance sundry civil act survey uncompleted contracts width worthy of improvement
Popular passages
Page 552 - War ; and in case of any litigation arising from any obstruction or alleged obstruction to navigation created by the construction of any bridge under this Act.
Page 521 - ... at all stages, and the soundings, accurately showing the bed of the stream, the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject; and until the said plan and location of the bridge are approved by the...
Page 563 - ... shall be made and all such obstructions be removed at the expense of the owner or owners of said bridge. And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river...
Page 577 - ... as will effectually obviate such obstruction; and all such alterations shall be made and all such obstructions be removed at the expense of the owner or owners of said bridge. And in case of any litigation arising from any obstruction or alleged obstruction to the...
Page 521 - ... security of navigation of said river as the Secretary of War shall prescribe; and, to secure that object, the said company or corporation shall submit to the Secretary of War, for his examination and approval, a design and drawings of the bridge, and a map of the location, giving...
Page 517 - That any bridge constructed under this Act and according to its limitations shall be a lawful structure, and shall be recognized and known as a post route, upon which also no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States, than the rate per mile paid for their transportation over the railroads or public highways leading to said bridge; and the United States shall have the right of way for postal telegraph purposes...
Page 576 - Tuat апУ bridge built under the provisions of rout«. ' this act and subject to its limitations shall be a lawful structure, and shall be recognized and known as a post route, upon which also no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States, or passengers or freight passing over the said bridge, than the rate per mile paid for the transportation over the railroad or public highways leading to the said bridge...
Page 514 - War, for his examination and approval, a design and drawings of the bridge, and a map of the location, giving, for the space of one mile above and one mile below...
Page 521 - ... between them shall be decided by the Secretary of War, upon a hearing of the allegations and proofs of the parties...
Page 579 - Mansion, eighteen thousand dollars, to be expended by contract or otherwise, as the President may determine. For fuel for the Executive Mansion, greenhouses, and stable, three thousand dollars.