Report of the Chief of Engineers U.S. ArmyU.S. Government Printing Office, 1889 |
From inside the book
Results 6-10 of 100
Page 57
... dams . In 1878 plans and estimates were submitted for the construction of a canal 8 feet deep around Enfield Rapids ; these estimates were revised in 1880. The esti- mated cost of this canal was $ 1,322,805 ; it was not considered ...
... dams . In 1878 plans and estimates were submitted for the construction of a canal 8 feet deep around Enfield Rapids ; these estimates were revised in 1880. The esti- mated cost of this canal was $ 1,322,805 ; it was not considered ...
Page 58
... dams were con- structed by private parties and by a State corporation up to 1868 with no permanent benefit . In 1868 a project for improvement by the United States was sub- mitted , under which a pile - dike was built at Hartford and ...
... dams were con- structed by private parties and by a State corporation up to 1868 with no permanent benefit . In 1868 a project for improvement by the United States was sub- mitted , under which a pile - dike was built at Hartford and ...
Page 74
... dam to protect the cut from the waters of the Harlem River , and to the removal of the material from a small section of the cut adjoining the coffer - dam . The amount that can be profitably expended during the year ending June 30 ...
... dam to protect the cut from the waters of the Harlem River , and to the removal of the material from a small section of the cut adjoining the coffer - dam . The amount that can be profitably expended during the year ending June 30 ...
Page 107
... dams or training - walls were added , the cost would be $ 60,000 . The project was amended in 1883 by reducing the proposed channel depth to 6 feet and the width to 50 feet ; the amount required to com- plete this project was then ...
... dams or training - walls were added , the cost would be $ 60,000 . The project was amended in 1883 by reducing the proposed channel depth to 6 feet and the width to 50 feet ; the amount required to com- plete this project was then ...
Page 114
... dams were extended a total of 232.3 feet , seven new ones built , aggregating 999.7 feet in length , and the ends of certain others connected by 9,140.6 feet of training - dikes . The work at Goode's Rocks was again taken up , and ...
... dams were extended a total of 232.3 feet , seven new ones built , aggregating 999.7 feet in length , and the ends of certain others connected by 9,140.6 feet of training - dikes . The work at Goode's Rocks was again taken up , and ...
Contents
3 | |
11 | |
31 | |
43 | |
55 | |
62 | |
73 | |
93 | |
320 | |
321 | |
325 | |
328 | |
333 | |
334 | |
342 | |
343 | |
103 | |
112 | |
115 | |
123 | |
124 | |
133 | |
141 | |
154 | |
161 | |
164 | |
167 | |
175 | |
184 | |
187 | |
193 | |
195 | |
200 | |
202 | |
203 | |
209 | |
217 | |
220 | |
225 | |
230 | |
234 | |
248 | |
252 | |
254 | |
255 | |
261 | |
262 | |
268 | |
274 | |
281 | |
286 | |
293 | |
306 | |
317 | |
344 | |
349 | |
353 | |
357 | |
359 | |
363 | |
368 | |
373 | |
376 | |
382 | |
386 | |
399 | |
457 | |
463 | |
478 | |
497 | |
503 | |
543 | |
545 | |
550 | |
584 | |
592 | |
599 | |
612 | |
649 | |
685 | |
751 | |
763 | |
799 | |
804 | |
813 | |
839 | |
849 | |
Other editions - View all
Common terms and phrases
100 feet wide 12 feet 1891 Submitted act of August adopted amount available Amount amount covered Amount estimated Appendix appropriated by act approved August 11 available Amount appropriated balance available Bayou breakwater bridge canal Chief of Engineers commenced completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike dredging dredging a channel ending June 30 entrance estimated cost exclusive of liabilities existing contracts existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep feet depth fiscal year ending harbor acts Island jetty Lake liabilities outstanding July low-water mean low water miles mouth obstructions officer in charge original project Point present project profitably expended proposed removal repairs required for completion requirements of sections river and harbor rock Secretary Secretary of War shoals snags Submitted in compliance vessels width worthy of improvement
Popular passages
Page 374 - That penstocks or other similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam herein authorized when approved by the Secretary of War upon the recommendation of the Chief of Engineers and of the Federal Power Commission...
Page 439 - That any bridge constructed under this act, and according to its limitations, shall be a lawful structure, and shall be recognized and known as a post-route, upon which, also, no higher charge shall be made for the transmission over the same of...
Page 17 - War ; and it shall not be lawful to excavate or fill, or In any manner to alter or modify the course, location, condition, or capacity of any port, roadstead, haven, harbor, canal, lake, harbor of refuge, or inclosure within the limits of any breakwater, or of the channel of any navigable water of the United States, unless the work has been recommended by the chief of engineers and authorized by the Secretary of War...
Page 444 - That all railroad companies desiring the use of said bridge shall have and be entitled to equal rights and privileges relative to the passage of railway trains...
Page 421 - ... security of navigation of said river as the Secretary of War shall prescribe ; and, to secure that object, the said company or corporation shall submit to the Secretary of War, for his examination and approval...
Page 434 - War for his examination and approval a design and drawings of said bridge and a map of the location, giving, for the space of one mile above and one mile below...
Page 415 - ... the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject; and until the said plan and location of the bridge are approved by the Secretary of War...
Page 428 - ... one mile above and one mile below the proposed location, the topography of the banks of the river, the shore- lines at high and low water, the direction and strength of the currents at all stages, and the soundings, accurately showing the bed of the stream...
Page 418 - War ; and in case of any litigation arising from any obstruction or alleged obstruction to navigation created by the construction of any bridge under this Act.
Page 93 - The project for the improvement was adopted in 1873, and provided for dredging a channel 4,700 feet long, 8 feet deep at mean low water, and 200 feet wide from the steam-boat dock to the 8-foot contour in Karitan Buy, at an estimated cost of $30,475.