Page images
PDF
EPUB
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]
[graphic]
[merged small][ocr errors][merged small]

Congress.
on Atomic Energy

MODIFICATIONS IN THE PROPOSED ARRANGEMENTS
FOR THE CLINCH RIVER BREEDER REACTOR
DEMONSTRATION PROJECT

HEARINGS

BEFORE THE

JOINT COMMITTEE ON ATOMIC ENERGY

CONGRESS OF THE UNITED STATES

NINETY-FOURTH CONGRESS

SECOND SESSION

ON

CONSIDERATION OF MATTERS WHICH RELATE TO MODI-
FICATIONS IN THE PROPOSED ARRANGEMENTS FOR THE
CLINCH RIVER BREEDER REACTOR DEMONSTRATION

PROJECT

APRIL 14 AND 29, 1976

Printed for the use of the Joint Committee on Atomic Energy

72-818 O

U.S. GOVERNMENT PRINTING OFFICE

WASHINGTON: 1976

For sale by the Superintendent of Documents, U.S. Government Printing Office
Washington, D.C. 20402 Price $4.40

XF25 As 1976c.

JOINT COMMITTEE ON ATOMIC ENERGY

JOHN O. PASTORE, Rhode Island, Chairman
MELVIN PRICE, Illinois, Vice Chairman

SENATE

HENRY M. JACKSON, Washington
STUART SYMINGTON, Missouri
JOSEPH M. MONTOYA, New Mexico
JOHN V. TUNNEY, California
HOWARD H. BAKER, JR., Tennessee
CLIFFORD P. CASE, New Jersey
JAMES B. PEARSON, Kansas
JAMES L. BUCKLEY, New York

HOUSE OF REPRESENTATIVES JOHN YOUNG, Texas

TENO RONCALIO, Wyoming

MIKE MCCORMACK, Washington
JOHN E. MOSS, California

JOHN B. ANDERSON, Illinois
MANUEL LUJAN, JR., New Mexico
FRANK HORTON, New Jersey
ANDREW J. HINSHAW, California

GEORGE F. MURPHY, Jr., Executive Director
JAMES B. GRAHAM, Assistant Director
WILLIAM C. PARLER, Committee Counsel
JAMES K. ASSELSTINE, Assistant Counsel

ALBION W. KNIGHT, Jr., Professional Staff Member
NORMAN P. KLUG, Technical Consultant
STEPHEN J. LANES, Technical Consultant
BEVERLY A. BAUGHMAN, Research Assistant

MICHAEL R. KEPPEL, GAO Consultant
CHRISTOPHER C. O'MALLEY, Printing Editor

(II)

[blocks in formation]
[ocr errors]
[ocr errors]

Enclosure 1. Proposed revised section of authorization bill.
Enclosure 2. Bill analysis..

Enclosure 3. Amended statutory criteria for fourth round arrange-
ments (February 1975) ____.

Enclosure 4. Revised program justification data arrangements No.
77-106 (February 1975).

Appendix A: CRBR cost estimate___

Paragraph (h) of No. 77-106 as subsequently revised and forwarded

to JCAE by Dr. Seaman's letter of January 16, 1976--

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][subsumed][merged small][ocr errors][subsumed][merged small][merged small]
« PreviousContinue »