U.S.C. 286a); sec. 404(b)(9), Public Health Service Act, 92 Stat. 3427 (42 U.S.C. 285)).

[45 FR 12243, Feb. 25, 1980, as amended at 48 FR 29201, June 24, 1983; 48 FR 45558, Oct. 6, 1983]

§ 52b.5 Evaluation.

In approving applications for construction grants under this part, the Director shall take into account, among other factors, the following:

(a) The relevance of the program for which construction is proposed to the objectives and priorities of the National Cancer Program (42 U.S.C. 286a),

(b) The scientific merits of the program for which construction is proposed,

(c) The scientific or professional standing or reputation of the agency or institution and of its existing or proposed officers and research staff,

(d) The availability, by affiliation or other association, of other scientific or health personnel and facilities to the extent necessary to carry out effectively the contemplated program, including the adequacy of an acceptable biohazard control and containment program where warranted,

(e) The need to accomplish appropriate geographical distribution of facilities, and

(f) The financial need of the applicant.

§ 52b.6 Other HHS regulations that apply.

Several other regulations apply to grants under this subpart. These include, but are not limited to:

42 CFR part 50, subpart D-Public Health Service grant appeals procedure

45 CFR part 16-Procedures of the Departmental Grant Appeals Board

45 CFR part 74-Administration of grants 45 CFR part 75-Informal grant appeals procedures

45 CFR part 80-Nondiscrimination under programs receiving Federal assistance through the Department of Health and Human Services effectuation of title VI of the Civil Rights Act of 1964

45 CFR part 81-Practice and procedure for hearings under part 80 of this title

45 CFR part 84-Nondiscrimination on the basis of handicap in programs and activities receiving or benefiting from Federal financial assistance

45 CFR part 91-Nondiscrimination on the basis of age in HHS programs or activities receiving Federal financial assistance

[49 FR 38110, Sept. 27, 1984]

§ 52b.7 Rate of Federal financial participation.

(a) The amount of a construction grant may not exceed 75 percent of the necessary allowable cost of construction as determined by the Director, except that in situations where the Director finds good cause for waiving requirements, for example, in order to achieve sufficient geographical distribution of facilities, the amount of the construction grant may exceed 75 percent of the necessary allowable cost of construction.

(b) Subject to paragraph (a) of this section, the Director shall set the actual rate of Federal financial participation in the necessary allowable cost of construction taking into consideration the most effective use of available Federal funds to further the purposes of section 406(b) or section 404(b)(9).

§ 52b.8 Terms and conditions.

In addition to any other requirement imposed by law or determined by the Director to be reasonably necessary with respect to any particular grant to fulfill the purposes thereof, each construction grant shall be subject to the condition that the applicant provide certain evidences, supported by such documentation as the Director may reasonably require. The Director may for good cause shown approve exceptions to these conditions and evidences where the Director finds that such exceptions are not inconsistent with the Act and the purposes of the program:

(a) Title. That the applicant has a fee simple or such other estate or interest in the site, including necessary easements and rights-of-way sufficient to assure for the estimated useful life of the facility, as determined by the Director, undisturbed use and possession for the purpose of the construction and operation of the facility.

(b) Plans and specifications. That approval by the Director of the final working drawings and specifications will be obtained before the project is advertised or placed on the market for bidding and that such approval shall

include a determination by the Director that the final plans and specifications conform to the minimum standards of construction and equipment as set forth in § 52b.11 of this part.

(c) Relocation assistance. That in the case of a public applicant with an approved project which involves the displacement of persons or businesses on or after January 4, 1971, the applicant will comply with the provisions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 ((42 U.S.C. 4601 et seq.), 84 Stat. 1984) and the applicable regulations issued thereunder (45 CFR part 15).

(d) Approval of changes in estimated cost. That the applicant will not enter into any construction contract or contracts for the project or a part thereof, the cost of which is in excess of the estimated cost approved in the application for that portion of the work covered by the plans and specifications, without the prior approval of the Director.

(e) Completion responsibility. That the applicant will construct the project, or cause it to be constructed, to final completion in accordance with the grant application and approved plans and specifications.

(f) Construction inspection. That the applicant will provide and maintain competent and adequate architectural or engineering inspection at the construction site to insure that the completed work conforms with the approved plans and specifications.

(g) Non-Federal share. That sufficient funds will be available to meet the non-Federal share of the cost of constructing the facility.

(h) Funds for operation. That sufficient funds will be available when construction is completed for effective use of the facility for the purposes for which it is being constructed.

(i) Inspection. That the Director and the Director's representatives shall have access at all reasonable times to work whereever it is in preparation or progress, and the contractor shall provide proper facilities for such access and inspection.

(j) Accessibility to handicapped. That, the facility shall be designed to comply with the Federal Accessibility Standard (41 CFR subpart 101-19.6) as modi

fied by other standards prescribed by the Director or the Administrator of General Services. The applicant will be responsible for conducting inspections to insure compliance with these specifications by the contractor.

(k) Minimum standards of construction and equipment. That the plans and specifications for the project will conform to the minimum standards of construction and equipment as set forth in § 52b.11 of this part.

[45 FR 12243, Feb. 25, 1980; 45 FR 20096, Mar. 27, 1980]

§ 52b.9 Acquisition of facilities.

In addition to the other requirements of this part, the following provisions are applicable to the acquisition of existing facilities.

(a) Minimum standards of construction and equipment. A determination by the Director that the facility conforms (or upon completion of any necessary construction will conform) to the minimum standards of construction and equipment as set forth in §52b.11 of this part, shall be obtained before entering into a final or unconditional contract for such acquisition. Where the Director finds that exceptions to or modification of any such minimum standards of construction and equipment would be consistent with the purposes of section 406(b) or section 404(b)(9) of the Act, the Director may authorize such exceptions or modifications;

(b) Estimated cost of acquisition and remodeling: Suitability of facility. Each application for a project involving the acquisition of existing facilities shall inIclude in the detailed estimates of the cost of the project, the cost of acquiring such facilities, and any cost of remodeling, renovating or altering such facilities to serve the purposes for which they are acquired. Such application shall demonstrate to the satisfaction of the Director that the architectural, structural and other pertinent features of the facility, as modified by any proposed expansion, remodeling, renovation, or alteration, will be clearly suitable for the purposes of section 406(b) or section 404(b)(9) of the Act, and, to the extent of the costs in which Federal participation is requested, are not in excess of what is necessary for

the services proposed to be provided in such facilities;

(c) Bona fide sale. Federal participation in the acquisition of existing facilities is on condition that such acquisition constitutes a bona fide sale involving an actual cost to the applicant and will result in additional or improved facilities for purposes of section 406(b) or section 404(b)(9) of the Act; and

(d) Facility which has previously received Federal grant. No grant for the acquisition of a facility which has previously received a Federal grant for construction, acquisition, or equipment shall serve either to reduce or restrict the liability of the applicant or any other transferor or transferee from any obligation of accountability imposed by the Federal Government by reason of such prior grant.

[45 FR 12243, Feb. 25, 1980; 45 FR 20096, Mar. 27, 1980]

§ 52b.10 Additional conditions.

The Director may with respect to any grant award impose additional conditions consistent with these regulations prior to or at the time of any award when in the Director's judgment such conditions are necessary to assure or protect advancement of the approved project, the interests of the National Cancer Program, or the conservation of grant funds.

§ 52b.11 Minimum standards of construction and equipment.

The standards set forth in this section have been determined by the Director to constitute minimum requirements for construction and equipment, including remodeling, renovation, or alteration of existing buildings, and shall apply to all projects for which Federal assistance is requested under section 406(b) or section 404(b)(9) of the Act. In accordance with 5 U.S.C. 552(a)(1), the publications to which reference is made in this section, unless otherwise indicated, are hereby incorporated by reference and made a part hereof. These documents are available for inspection at the Department and Regional Offices' Information Centers listed in 45 CFR 5.31 and copies of such documents may be purchased as specified. The Director may for good cause

shown approve plans and specifications which contain deviations from the requirements prescribed, if the Director is satisfied that the purposes of such requirements have been fulfilled. In addition to these requirements, it is recognized that each project will have to meet the requirements of State and/or local codes and ordinances relating to construction.

(a) General. The structural design, construction, and fire safety provisions of all project facilities shall comply with the standards of the Uniform Building Code (available from International Conference of Building Officials, 5360 South Workman Road, Whittier, CA 90601) or with applicable State or local codes and ordinances, whichever is more restrictive.

(b) Mechanical. All installations of fuel burning equipment, steam, heating, air conditioning and ventilation, plumbing and other piping systems, incinerators, and boilers shall comply with the following standards:

(1) Handbook of Fundamentals: American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE), United Engineer Center, 345 East 47th Street, New York, NY 10017.

(2) National Standard Plumbing

Code: National Association of Plumbing-Heating-Cooling Contractors, 1016 20th Street NW., Washington, DC 20036.

(3) Standard for Non-Flammable Medical Gas Systems, 1973, NFPA Bulletin No. 56F, National Fire Protection Association, 470 Atlantic Avenue, Boston, MA 02110.

(4) Standard for Medical-Surgical Vacuum Systems in Hospitals, Pamphlet P-2.1: Compressed Gas Association (CGA), 500 Fifth Avenue, New York, NY 10036.

(c) Fire and safety. The fire-resistant design criteria for the facility will be governed by the criteria necessary for that portion of the facility which is subject to the most severe usage. Remodeled structures shall be upgraded, in total, unless it is feasible to isolate the improved portion of the building with fire walls and fire doors. Fire-resistant design shall be in accordance with the standards of Life Safety Code, NFPA No. 101, 1973, National Fire Protection Association, 470 Atlantic Avenue, Boston, MA 02110.

174-160 0-97--8

(d) Emergency electrical service. Fire alarm systems and other electrical service shall conform to the standards as specified in Life Safety Code, NFPA No. 101, 1973, National Fire Protection Association, 470 Atlantic Avenue, Boston, MA 02110.

(e) Electrical. All electrical installations and equipment shall be in accordance with State and local codes and applicable sections of National Electric Code, NFPA Bulletin No. 70, 1971, National Fire Protection Association, 470 Atlantic Avenue Boston, MA 02110.

(f) Radiation protection. All areas in which X-ray, gamma-ray, beta-ray producing and similar equipment is located shall be protected from radiation in accordance with the standards which are in the Handbook Reports No. 33 and 34: National Council on Radiation Protection (NCRP), P.O. Box 30175, Washington, DC 20008.

bers of ethnic minority faculty, students, and investigators engaged in biomedical research, and to broaden the opportunities for participation in biomedical research of ethnic minority faculty, students, and investigators, by providing general support for biomedical research programs at eligible institutions.

(g) Earthquake. All facilities shall be designed and constructed in accordance with the standards specified in the Uniform Building Code, 1973, International Conference of Building Officials, 5360 South Workman Mill Road, Whittier, CA 90601, unless more restrictive State and local codes govern.

(h) Zoning. State and local codes shall apply.

[45 FR 12243, Feb. 25, 1980; 45 FR 20096, Mar. 27, 1980]

PART 52c-MINORITY BIOMEDICAL RESEARCH SUPPORT PROGRAM

Sec.

52c.1 Applicability.

52c.2 Definitions.

52c.3 Eligibility.

52c.4 Application.

52c.5 Grant awards.

52c.6 Expenditure of grant funds.

52c.7 Other HHS regulations that apply. 52c.8 Additional conditions.

AUTHORITY: 42 U.S.C. 216, 241(a)(3).

[58 FR 61030, Nov. 19, 1993]

§ 52c.2 Definitions.

As used in this part:

Act means the Public Health Service Act, as amended (42 U.S.C. 201 et seq.). Ethnic minorities includes but is not limited to such groups as Black Americans, Hispanic Americans, Asian/Pacific Islanders, and American Indians/ Native Alaskans (Native Americans).

HHS means the Department of Health and Human Services.

SOURCE: 45 FR 12246, Feb. 25, 1980, unless otherwise noted.

§ 52c.1 Applicability.

Nonprofit as applied to any institution means an institution which is a corporation or association no part of the net earnings of which inures or may lawfully inure to the benefit of any private shareholder or individual.

[merged small][ocr errors][merged small]

Program director means a single individual, designated in the grant application, who is scientifically trained and has research experience and who is responsible for the overall execution of the program supported under this part at the grantee institution.

The regulations in this part apply to grants (under the Minority Biomedical Research Support Program) awarded in accordance with section 301(a)(3) of the Public Health Service (PHS) Act (42 U.S.C. 241(a)(3)) to increase the num

[ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Secretary means the Secretary of Health and Human Services and any other officer or employee of the Department of Health and Human Services to whom the authority involved has been delegated.

[58 FR 61030, Nov. 19, 1993]

§ 52c.3 Eligibility.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

To be eligible for a grant under this Program, an applicant must be:

(a) One of the following:

(1) A public or private nonprofit university, four year college, or other institution offering undergraduate, graduate, or health professional degrees, with a traditionally high (more than 50 percent) minority student enrollment;

(2) A public or private nonprofit two year college with a traditionally high (more than 50 percent) minority student enrollment;

Th

accr

medical

00% of

2) T

&Scien

enga

(3) A public or private nonprofit university, four year college, or other institution offering undergraduate, graduate, or health professional degrees, with a student enrollment a significant proportion (but not necessarily more than 50 percent) of which is derived from ethnic minorities, provided the Secretary determines that said institution has a demonstrated commitment to the special encouragement of and assistance to ethnic minority faculty, students, and investigators; or

(4) An Indian tribe which has a recognized governing body which performs substantial governmental functions, or an Alaska Regional Corporation as defined in the Alaska Native Claims Settlement Act (43 U.S.C. 1601 et seq.), and

(b) Located in a State, the District of Columbia, Puerto Rico, the Virgin Islands, the Canal Zone, Guam, American Samoa, or the successor States of the Trust Territory of the Pacific Islands (the Federated States of Micronesia, the Republic of the Marshall Islands, and the Republic of Palau).

[45 FR 12246, Feb. 25, 1980; 45 FR 20096, Mar. 27, 1980; 58 FR 61030, Nov. 19, 1993]

[blocks in formation]

(a) Within the limits of funds available, and upon such recommendation as may be required by law, the Secretary shall award grants to those applications with proposed biomedical research programs which will, in the Secretary's judgment, best promote the purposes of this part, taking into consideration among other pertinent factors:

(1) The benefits that can be expected to accrue to the national effort in biomedical research and in increasing the pool of biomedical researchers;

(2) The institution's capability, from a scientific and technical standpoint, to engage in biomedical research;

(3) The benefits that can be expected to accrue to the institution and its students;

(4) The administrative and managerial capability and competence of the applicant;

(5) The availability of the facilities and resources (including where necessary collaborative arrangements

with other institutions) to engage in biomedical research;

(6) The applicant's relative need for funding; and

(7) The overall significance of the proposal in terms of numbers of ethnic minority persons benefited thereby.

(b) The notice of grant award specifies how long HHS intends to support the project without requiring the project to recompete for funds. This period, called the project period, will usually be for 1-5 years.

(c) Generally the grant will initially be for one year and subsequent continuation awards will also be for one year at a time. A grantee must submit a separate application to have the support continued for each subsequent year. Decisions regarding continuation awards and the funding level of such awards will be made after consideration of such factors as the grantee's progress and management practices, and the availability of funds. In all cases, continuation awards require a determination by HHS that continued funding is in the best interest of the government.

(d) Neither the approval of any application nor the award of any grant commits or obligates the United States in any way to make any additional, supplemental, continuation, or other award with respect to any approved application or portion of an approved application.

[45 FR 12246, Feb. 25, 1980; 45 FR 20096, Mar. 27, 1980; 58 FR 61030, Nov. 19, 1993]

§ 52c.6 Expenditure of grant funds.

(a) Any funds granted pursuant to this part shall be expended solely for the purposes for which the funds were granted in accordance with the approved application and budget, the regulations of this part, the terms and conditions of the award, and the applicable cost principles prescribed by subpart Q of 45 CFR part 74.