Greater Wenatchee Division, Chief Joseph Dam Project, Washington. Letter... Pursuant to Section 9 (a) of the Reclamation Project Act of 1939 (53 Stat. 1187) and the Act of July 17, 1952 (66 Stat. 753)U.S. Government Printing Office, 1958 - 117 pages |
From inside the book
Results 1-5 of 11
Page 24
... designed to serve 10 - acre farm units when the area is fully developed . However , the estimate is based on the construction of turnouts for each ownership or a maximum farm unit size of 20 acres . The minimum size unit for which a ...
... designed to serve 10 - acre farm units when the area is fully developed . However , the estimate is based on the construction of turnouts for each ownership or a maximum farm unit size of 20 acres . The minimum size unit for which a ...
Page 25
... designed to deliver approximately 7.3 gallons per minute per irrigable acre or about 1 cubic foot per second for each 61 acres and will deliver about 26 percent of the estimated seasonal requirement of 3.85 acre - feet per acre in a 31 ...
... designed to deliver approximately 7.3 gallons per minute per irrigable acre or about 1 cubic foot per second for each 61 acres and will deliver about 26 percent of the estimated seasonal requirement of 3.85 acre - feet per acre in a 31 ...
Page 29
... designed to deliver , on a continuous flow basis , 1 cubic foot per second for each 62 irrigable acres or about 7.3 gallons per minute per acre and will deliver about 26 percent of the estimated seasonal requirement of 3.83 acre - feet ...
... designed to deliver , on a continuous flow basis , 1 cubic foot per second for each 62 irrigable acres or about 7.3 gallons per minute per acre and will deliver about 26 percent of the estimated seasonal requirement of 3.83 acre - feet ...
Page 32
... designed for furrow irrigation . It includes a regulating reservoir , a short length of concrete - lined canal , and a low - head concrete pipe lateral system . Regulating reservoir . — The regulating reservoir for the unit would be an ...
... designed for furrow irrigation . It includes a regulating reservoir , a short length of concrete - lined canal , and a low - head concrete pipe lateral system . Regulating reservoir . — The regulating reservoir for the unit would be an ...
Page 35
... designed to deliver about 7.3 gallons per minute per irrigable acre on a continuous flow basis or about 1 cubic foot per second for each 62 acres and will deliver approximately 26 percent of the estimated seasonal requirement of 3.82 ...
... designed to deliver about 7.3 gallons per minute per irrigable acre on a continuous flow basis or about 1 cubic foot per second for each 62 acres and will deliver approximately 26 percent of the estimated seasonal requirement of 3.82 ...
Common terms and phrases
50-year period acres allocation alternative amount annual cost annual operating costs Antoine Creek unit apple authorization average basis budgets capacity capitalized operating costs charge Chelan Chief Joseph Dam Class Columbia River construction costs County crops Department designed discharge line distribution system East unit Electric estimated expenses facilities Federal feet fish and wildlife fish screens Foster Creek division fruit Greater Wenatchee division increased farm interest Interior investment irrigable acres irrigable land irrigation benefits Joseph Dam project July lateral system less located major Moses Coulee unit North Pateros unit Operation and maintenance orchard percent period pipe Plan of development present production proposed Public pumping plant Reclamation recommended region regulating reservoir repayment replacement Secretary selected serve shown South Pateros sprinkler steel summary supply TABLE terraces tion Total Wash Washington water users
Popular passages
Page 1 - Interior* under said plans shall be governed by the Federal Reclamation Laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto...
Page xi - I recommend further that you approve and adopt this report as your proposed report on the Greater Wenatchee division of the Chief Joseph Dam project, and that you authorize me, in your behalf, to transmit copies to the States of the Columbia River Basin and to the Secretary of the Army in accordance with requirements of the Flood Control Act of 1944 (58 Stat.
Page xi - State wherein the impoundment, diversion, or other control facility is to be constructed...
Page i - Interior, the proposed works shall not be deemed authorized except upon approval by an Act of Congress ; and subsection 9 (a) of the Reclamation Project Act of 1939 (53 Stat. 1187) and subsection 3 (a) of the Act of August 11, 1939 (53 Stat. 1418), as amended, are hereby amended accordingly.
Page iii - Hon. SAM RAYBURN, Speaker of the House of Representatives, Washington, DC DEAR MR. SPEAKER...
Page vii - Army in accordance with the provisions of section 1 (c) of the Flood Control Act of 1944 (58 Stat. 887) and to the State of...
Page ix - The SECRETARY OF THE INTERIOR. SIR: This is my proposed report on the initial development, Roaring Fork diversion, of the potential Gunnison-Arkansas project, Colorado.
Page 78 - Secretary determines to be beyond the ability of the water users to pay shall be charged to, and returnable to the reclamation fund from, net revenues derived from the sale of power from the...
Page xi - State, in accordance with provisions of the Act of August 14, 1946 (60 Stat.
Page 98 - Creek development as, upon further study in accordance with section 2 of the Act of August 14, 1946 (60 Stat. 1080, 16 USC 662), he finds to be required for the preservation and propagation of fish and wildlife.