... assessment plan such as outlined in plans 3 , 5 and 6 or some suitable variation there- from to meet local conditions . Ornamental street lighting has shown marked progress in these com- munities because the desires of the merchants and ...
... assessment plan such as outlined in plans 3 , 5 and 6 or some suitable variation there- from to meet local conditions . Ornamental street lighting has shown marked progress in these com- munities because the desires of the merchants and ...
Page 371
... assessment for the back of the lot was computed for the frontage on Walnut Street being 50 ft . in excess of the 100 ft . depth limit , and the additional area of the lot not originally assessed . In other words , the second assessment ...
... assessment for the back of the lot was computed for the frontage on Walnut Street being 50 ft . in excess of the 100 ft . depth limit , and the additional area of the lot not originally assessed . In other words , the second assessment ...
Page 372
... assessments in annual installments over a period of five or ten years . In such cases interest is added on the unpaid portion of the assessment . No one method of assessment is applicable to all cases . A combina- tion of methods is ...
... assessments in annual installments over a period of five or ten years . In such cases interest is added on the unpaid portion of the assessment . No one method of assessment is applicable to all cases . A combina- tion of methods is ...
Contents
City Planning | 9 |
The Practical Side of City Replanning | 16 |
What About Parks? | 39 |
60 other sections not shown
Other editions - View all
Common terms and phrases
airport American Society amount applied asphalt cement Asphaltic Concrete assessment binder course bitumen Bldg brick building Bureau Bureau of Engineering carbon Chairman Chicago Chief Engineer chlorine City Engineer City Hall City Planning coarse aggregate Committee concrete construction Consulting Engineer Contractor cost County curb Department desirable Detroit City Airport equipment feet field filler grade gravel hangar heating Highway improvements inches installation joints land less located Louis material ment method Missouri mixed Municipal Engineers necessary Ohio operation owner Park pavement Paving percent Philadelphia pipe Pittsburgh planes plant port Portland Cement possible PRESIDENT REID projects removed road roller runway sample sand Section sewage sewer sewerage sidewalk sieve slab sludge sludge digestion Society of Municipal steel stone street lighting subgrade Surveyor tank tion traffic treatment Warren Brothers width York York City zeolite