To place Granite School District schools on the same educational program as Salt Lake City, Ogden, Provo, and Logan (full year kindergarten, full day 1st grade, and elimination of double session classes) we need 238 additional classrooms for the present year (1962-63), 466 additional classrooms by 1964-65, and SOC additional classrooms by 1967-68 with resultant costs shown in the last column. These estimates do not include the cost of school sites. The total cost of school sites would be approximately $2,500,000. NOTE.-During this 12-year period, the school enrollments in grades 1 through 12 have more than tripled. Continuing school building program data-List of existing school buildings in Scheduled for replacement, remodeling, or addition. NOTE.-Figures in column 4 do not reflect makeshift or non-school-owned classrooms. 6-year school building program, school year 1968 64 through 1968-69 [Projects in order of time of construction priority] 99,000 48,000 857,000 3100 South 20th East. 5100 South 22nd West. 1 Administrative suite. Music building. |