and locations and under all circum- $ 110.9 Notice. stances and conditions, except as pro

Any person in charge of any vessel vided in $110.6, include discharges or onshore or offshore facility shall, as which:

soon as he has knowledge of any dis(a) Violate applicable water quality charge of oil from such vessel or facilistandards in navigable waters of the ty in violation of 110.5, immediately United States, or

notify the appropriate agency of such (b) Cause a film or sheen upon or discharge in accordance with such prodiscoloration of the surface of the cedures as the Secretary of Transporwater or adjoining shorelines or cause tation may prescribe. The procedures a sludge or emulsion to be deposited for such notice are set forth in U.S. beneath the surface of the water or

Coast Guard regulations, 33 CFR Part upon adjoining shorelines.

153, Subpart B, 41 FR 12628 et seq.

(March 25, 1976). $ 110.5 Discharge prohibited.

PART 112-OIL POLLUTION As provided in section 311(b)(3) of the Federal Act, no person shall dis

PREVENTION charge or cause or permit to be discharged into or upon the navigable

Sec.

112.1 General applicability. waters of the United States, adjoining

112.2 Definitions. shorelines, or into or upon the waters

112.3 Requirements for preparation and of the contiguous zone any oil, in implementation of Spill Prevention Conharmful quantities as determined in trol and Countermeasure Plans. 88 110.3 and 110.4 except as the same

112.4 Amendment of SPCC Plans by Remay be permitted in the contiguous

gional Administrator.

112.5 Amendment of Spill Prevention Conzone under Article IV of the Interna

trol and Countermeasure Plans by tional Convention for the Prevention

owners or operators. of Pollution of the Sea by Oil, 1954, as 112.6 Civil penalties for violation of Oil amended.

Pollution Prevention Regulations.

112.7 Guidelines for the preparation and $ 110.6 Exception for vessel engines.

implementation of a Spill Prevention

Control and Countermeasure Plan.
For purposes of section 311(b) of the
Federal Act, discharges of oil from a

APPENDIX-Memorandum of Understanding

Between the Secretary of Transportaproperly functioning vessel engine are

tion and the Administrator of the Envi. not deemed to be harmful; but such oil

ronmental Protection Agency. accumulated in a vessel's bilges shall

AUTHORITY: Secs. 311(1)(1)(C), 311(1)(2), not be so exempt.

501(a), Federal Water Pollution Control Act

(Sec. 2, Pub. L. 92-500, 86 Stat. 816 et seq. $ 110.7 Dispersants.

(33 U.S.C. 1251 et seq.)); Sec. 4(b), Pub. L. Addition of dispersants or emulsifi

92-500, 86 Stat. 897; 5 U.S.C. Reorg. Plan of

1970 No. 3 (1970), 35 FR 15623, 3 CFR 1966ers to oil to be discharged which would

1970 Comp.; E.O. 11735, 38 FR 21243, 3 circumvent the provisions of this part

CFR, unless otherwise noted. is prohibited.

SOURCE: 38 FR 34165, Dec. 11, 1973, unless $ 110.8 Demonstration projects.

otherwise noted. Notwithstanding any other provi- $ 112.1 General applicability. sions of this part, the Administrator of

(a) This part establishes procedures, the Environmental Protection Agency

methods and equipment and other remay permit the discharge of oil into or

quirements for equipment to prevent upon the navigable waters of the

the discharge of oil from non-transUnited States, adjoining shorelines, or portation-related onshore and offinto or upon the waters of the contigu- shore facilities into or upon the navious zone, in connection with research, gable waters of the United States or demonstration projects, or studies re- adjoining shorelines. lating to the prevention, control, or (b) Except as provided in paragraph abatement of oil pollution.

(d) of this section, this part applies to

owners or operators of non-transportation-related onshore and offshore facilities engaged in drilling, producing, gathering, storing, processing, refining, transferring, distributing or consuming oil and oil products, and which, due to their location, could reasonably be expected to discharge oil in harmful quantities, as defined in Part 110 of this chapter, into or upon the navigable waters of the United States or adjoining shorelines.

(c) As provided in sec. 313 (86 Stat. 875) departments, agencies, and instrumentalities of the Federal government are subject to these regulations to the same extent as any person, except for the provisions of § 112.6.

(d) This part does not apply to:

(1) Facilities, equipment or operations which are not subject to the jurisdiction of the Environmental Protection Agency, as follows:

(i) Onshore and offshore facilities, which, due to their location, could not reasonably be expected to discharge oil into or upon the navigable waters of the United States or adjoining shorelines. This determination shall be based solely upon a consideration of the geographical, locational aspects of the facility (such as proximity to navigable waters or adjoining shorelines, land contour, drainage, etc.) and shall exclude consideration of manmade features such as dikes, equipment or other structures which may serve to restrain, hinder, contain, or otherwise prevent a discharge of oil from reaching navigable waters of the United States or adjoining shorelines; and

(ii) Equipment or operations of vessels or transportation-related onshore and offshore facilities which are subject to authority and control of the Department of Transportation, as defined in the Memorandum of Understanding between the Secretary of Transportation and the Administrator of the Environmental Protection Agency, dated November 24, 1971, 36 FR 24000.

(2) Those facilities which, although otherwise subject to the jurisdiction of the Environmental Protection Agency, meet both of the following requirements:

30-101-79--3

(i) The underground buried storage capacity of the facility is 42,000 gallons or less of oil, and

(ii) The storage capacity, which is not buried, of the facility is 1,320 gallons or less of oil, provided no single container has a capacity in excess of 660 gallons.

(e) This part provides for the preparation and implementation of Spill Prevention Control and Countermeasure Plans prepared in accordance with § 112.7, designed to complement existing laws, regulations, rules, standards, policies and procedures pertaining to safety standards, fire prevention and pollution prevention rules, so as to form a comprehensive balanced Federal/State spill prevention program to minimize the potential for oil discharges. Compliance with this part does not in any way relieve the owner or operator of an onshore or an offshore facility from compliance with other Federal, State or local laws.

[38 FR 34165, Dec. 11, 1973, as amended at 41 FR 12657, Mar. 26, 1976]

§ 112.2 Definitions.

For the purposes of this part:

(a) "Oil" means oil of any kind or in any form, including, but not limited to petroleum, fuel oil, sludge, oil refuse and oil mixed with wastes other than dredged spoil.

(b) "Discharge" includes but is not limited to, any spilling, leaking, pumping, pouring, emitting, emptying or dumping. For purposes of this part, the term "discharge" shall not include any discharge of oil which is authorized by a permit issued pursuant to Section 13 of the River and Harbor Act of 1899 (30 Stat. 1121, 33 U.S.C. 407), or sections 402 or 405 of the FWPCA Amendments of 1972 (86 Stat. 816 et seq., 33 U.S.C. 1251 et seq.).

(c) "Onshore facility" means any facility of any kind located in, on, or under any land within the United States, other than submerged lands, which is not a transportation-related facility.

(d) "Offshore facility" means any facility of any kind located in, on, or under any of the navigable waters of the United States, which is not a transportation-related facility.

a means of transportation on water, other than a public vessel.

as

(e) "Owner or operator" means any person owning or operating an onshore facility or an offshore facility, and in the case of any abandoned offshore facility, the person who owned or operated such facility immediately prior to such abandonment.

(f) “Person" includes an individual, firm, corporation, association, and a partnership.

(g) “Regional Administrator", means the Regional Administrator of the Environmental Protection Agency, or his designee, in and for the Region in which the facility is located.

(h) "Transportation-related" and “non-transportation-related" applied to an onshore or offshore facility, are defined in the Memorandum of Understanding between the Secretary of Transportation and the Administrator of the Environmental Protection Agency, dated November 24, 1971, 36 FR 24080.

(i) “Spill event” means a discharge of oil into or upon the navigable waters of the United States or adjoining shorelines in harmful quantities, as defined at 40 CFR Part 110.

(j) “United States” means the States, the District of Columbia, the Commonwealth of Puerto Rico, the Canal Zone, Guam, American Samoa, the Virgin Islands, and the Trust Territory of the Pacific Islands.

(k) The term “navigable waters” of the United States means “navigable waters” as defined in section 502(7) of the FWPCA, and includes:

(1) All navigable waters of the United States, as defined in judicial decisions prior to passage of the 1972 Amendments to the FWPCA (Pub. L. 92-500), and tributaries of such waters;

(2) Interstate waters;

(3) Intrastate lakes, rivers, and streams which are utilized by interstate travelers for recreational or other purposes; and

(4) Intrastate lakes, rivers, and streams from which fish or shellfish are taken and sold in interstate commerce.

(1) "Vessel” means every description of watercraft or other artificial contrivance used, or capable of being used as

$ 112.3 Requirements for preparation and

implementation of Spill Prevention

Control and Countermeasure Plans. (a) Owners or operators of onshore and offshore facilities in operation on or before the effective date of this part that have discharged or, due to their location, could reasonably be expected to discharge oil in harmful quantities, as defined in 40 CFR Part 110, into or upon the navigable waters of the United States or adjoining shorelines, shall prepare a Spill Prevention Control and Countermeasure Plan (hereinafter “SPCC Plan”), in writing and in accordance with g 112.7. Except as provided for in paragraph (f) of this section, such SPCC Plan shall be prepared within six months after the ef. fective date of this part and shall be fully implemented as soon as possible, but not later than one year after the effective date of this part.

(b) Owners or operators of onshore and offshore facilities that become operational after the effective date of this part, and that have discharged or could reasonably be expected to discharge oil in harmful quantities, as defined in 40 CFR Part 110, into or upon the navigable waters of the United States or adjoining shorelines, shall prepare an SPCC Plan in accordance with § 112.7. Except as provided for in paragraph (f) of this section, such SPCC Plan shall be prepared within six months after the date such facility begins operations and shall be fully implemented as soon as possible, but not later than one year after such facility begins operations.

(c) Owners or operators of onshore and offshore mobile or portable facilities, such as onshore drilling or workover rigs, barge mounted offshore drilling or workover rigs, and portable fueling facilities shall prepare and implement an SPCC Plan as required by paragraphs (a), (b) and (d) of this section. The owners or operators of such facility need not prepare a new SPCC Plan each time the facility is moved to a new site. The SPCC Plan may be a general plan, prepared in accordance with $ 112.7, using good engineering

practice. When the mobile or portable facility is moved, it must be located and installed using the spill prevention practices outlined in the SPCC Plan for the facility. No mobile or portable facility subject to this regulation shall operate unless the SPCC Plan has been implemented. The SPCC Plan shall only apply while the facility is in a fixed (non-transportation) operating mode.

(d) No SPCC Plan shall be effective to satisfy the requirements of this part unless it has been reviewed by a Registered Professional Engineer and certified to by such Professional Engineer. By means of this certification the engineer, having examined the facility and being familiar with the provisions of this part, shall attest that the SPCC Plan has been prepared in accordance with good engineering practices. Such certification shall in no way relieve the owner or operator of an onshore or offshore facility of his duty to prepare and fully implement such Plan in accordance with § 112.7, as required by paragraphs (a), (b) and (c) of this section.

(e) Owners or operators of a facility for which an SPCC Plan is required pursuant to paragraphs (a), (b) or (c) of this section shall maintain a complete copy of the Plan at such facility if the facility is normally attended at least 8 hours per day, or at the nearest field office if the facility is not so attended, and shall make such Plan available to the Regional Administrator for on-site review during normal working hours.

(f) Extensions of time.

(1) The Regional Administrator may authorize an extension of time for the preparation and full implementation of an SPCC Plan beyond the time permitted for the preparation and implementation of an SPCC Plan pursuant to paragraphs (a), (b) or (c) of this section where he finds that the owner or operator of a facility subject to paragraphs (a), (b) or (c) of this section cannot fully comply with the requirements of this part as a result of either nonavailability of qualified personnel, or delays in construction or equipment delivery beyond the control and without the fault of such owner or opera

tor or their respective agents or employees.

(2) Any owner or operator seeking an extension of time pursuant to paragraph (f)(1) of this section may submit a letter of request to the Regional Administrator. Such letter shall include:

(i) A complete copy of the SPCC Plan, if completed;

(ii) A full explanation of the cause for any such delay and the specific aspects of the SPCC Plan affected by the delay;

(iii) A full discussion of actions being taken or contemplated to minimize or mitigate such delay;

(iv) A proposed time schedule for the implementation of any corrective actions being taken or contemplated, including interim dates for completion of tests or studies, installation and operation of any necessary equipment or other preventive measures.

In addition, such owner or operator may present additional oral or written statements in support of his letter of request.

(3) The submission of a letter of request for extension of time pursuant to paragraph (f)(2) of this section shall in no way relieve the owner or operator from his obligation to comply with the requirements of § 112.3 (a), (b) or (c). Where an extension of time is authorized by the Regional Administrator for particular equipment or other specific aspects of the SPCC Plan, such extension shall in no way affect the owner's or operator's obligation to comply with the requirements of § 112.3 (a), (b) or (c) with respect to other equipment or other specific aspects of the SPCC Plan for which an extension of time has not been expressly authorized.

[38 FR 34165, Dec. 11, 1973, as amended at 41 FR 12657, Mar. 26, 1976]

§ 112.4 Amendment of SPCC Plans by Regional Administrator.

(a) Notwithstanding compliance with § 112.3, whenever a facility subject to § 112.3 (a), (b) or (c) has: Discharged more than 1,000 U.S. gallons of oil into or upon the navigable waters of the United States or adjoining shorelines in a single spill event, or discharged oil in harmful quantities,

as defined in 40 CFR Part 110, into or upon the navigable waters of the United States or adjoining shorelines in two spill events, reportable under section 311(b)(5) of the FWPCA, OCcurring within any twelve month period, the owner or operator of such facility shall submit to the Regional Administrator, within 60 days from the time such facility becomes subject to this section, the following:

(1) Name of the facility;

(2) Name(s) of the owner or operator of the facility;

(3) Location of the facility;

(4) Date and year of initial facility operation;

(5) Maximum storage or handling capacity of the facility and normal daily throughput;

(6) Description of the facility, including maps, flow diagrams, and topographical maps;

(7) A complete copy of the SPCC Plan with any amendments;

(8) The cause(s) of such spill, includ. ing a failure analysis of system or subsystem in which the failure occurred;

(9) The corrective actions and/or countermeasures taken, including an adequate description of equipment repairs and/or replacements;

(10) Additional preventive measures taken or contemplated to minimize the possibility of recurrence;

(11) Such other information as the Regional Administrator may reasonably require pertinent to the Plan or spill event.

(b) Section 112.4 shall not apply uniil the expiration of the time permitted for the preparation and implementation of an SPCC Plan pursuant to $ 112.3 (a), (b), (c) and (f).

(c) A complete copy of all information provided to the Regional Administrator pursuant to paragraph (a) of this section shall be sent at the same time to the State agency in charge of water pollution control activities in and for the State in which the facility is located. Upon receipt of such information such State agency may conduct a review and make recommendations to the Regional Administrator as to further procedures, methods, equipment and other requirements for equipment necessary to prevent and to

contain discharges of oil from such facility.

(d) After review of the SPCC Plan for a facility subject to paragraph (a) of this section, together with all other information submitted by the owner or operator of such facility, and by the State agency under paragraph (c) of this section, the Regional Administrator may require the owner or operator of such facility to amend the SPCC Plan if he finds that the Plan does not meet the requirements of this part or that the amendment of the Plan is necessary to prevent and to contain discharges of oil from such facility.

(e) When the Regional Administrator proposes to require an amendment to the SPCC Plan, he shall notify the facility operator by certified mail addressed to, or by personal delivery to, the facility owner or operator, that he proposes to require an amendment to the Plan, and shall specify the terms of such amendment. If the facility owner or operator is a corporation, a copy of such notice shall also be mailed to the registered agent, if any, of such corporation in the State where such facility is located. Within 30 days from receipt of such notice, the facili. ty owner or operator may submit written information, views, and arguments on the amendment. After considering all relevant material presented, the Regional Administrator shall notify the facility owner or operator of any amendment required or shall rescind the notice. The amendment required by the Regional Administrator shall become part of the Plan 30 days after such notice, unless the Regional Administrator, for good cause, shall specify another effective date. The owner or operator of the facility shall implement the amendment of the Plan as soon as possible, but not later than six months after the amendment becomes part of the Plan, unless the Regional Administrator specifies another date.

(f) An owner or operator may appeal a decision made by the Regional Administrator requiring an amendment to an SPCC Plan. The appeal shall be made to the Administrator of the United States Environmental Protection Agency and must be made in writ