Page 85 - Consolidated Edison Company of New York, Inc. 4 Irving Place New York, New York 10003 General Information Utility: electric, gas, and steam service.
Page 104 - ... within which each host utility can structure a specific recovery organization for each operating reactor. A national inventory of personnel and material will be identified. Each specific emergency response plan will utilize portions of this national inventory, as dictated by the individual utility's requirements. Ill Critical Elements of Emergency Response Plans A. Each nuclear power plant licensee will have an emergency response plan established which: (1) Defines the emergency response organization...
Page 68 - House Committee on Interior and Insular Affairs, Subcommittee on Energy and the Environment, International Proliferation of Nuclear Technology, report prepared by Warren H.
Page 92 - Lundy Engineers 6151 West Century Blvd. Suite 920 Los Angeles, California 90045 SECRETARY: Fred Stetson Licensing 6 Safety Projects Manager Atomic Industrial Forum 7101 Wisconsin Avenue 12th Floor Washington, DC 20014 D. Louis Peoples Director, Nuclear Licensing Commonwealth Edison Company One First National Plaza P. 0. Box 767 Chicago, Illinois 60690 Stan B. Jacobs Chief Licensing Engineer Stone $ Webster Engineering P.
Page 70 - On the other hand, changing all two dozen factors nay not be productive, even though there Is some tendency to require this by regulation. Some remedies can pre-empt or conflict with others, and even useful ones may have widely different benefits and priorities. Somewhere in between these extremes there are a few very important remedies which can apply to most plants - and a few more which may apply selectively to some plant designs but not to others.
Page 104 - ... facilities and identifies the principle host utility managers in that organization. (2) Identifies the committed external personnel and their role in the defined emergency response organization. (3) Specifies the actions necessary to assess off -site radiological consequences, and defines off-site notification procedures. NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN (4) Defines relationships with off-site emergency and regulating authorities. The plans established for these purposes provide a...
Page 84 - Box 61000 New Orleans, LA 70161 Harry J. Green Chief Nuclear Generator Branch Tennessee Valley Authority 727 Edeney Building Chattanooga, TN 37401 Joseph R. Holder Assistant Plant Superintendent Nuclear Project No. 1 Washington Public Power Supply System 3000 George Washington Way PO Box 968 Richland, WA 99352 Wayne H . Jens Assistant Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Robert Jorgenson American Electric Power Company , Inc . 2 Broadway...
Page 60 - Internal changes are being made to assure that the technical and managerial structures are arranged to provide the proper balance between safety, reliability, and cost of operation. Clearly, Three Mile Island taught us something. These individual internal utility efforts are expected to continue in addition to the industry-wide activities. One of the first actions of the Ad Hoc Oversight Committee was to request and authorize the Electric Power Research Institute to set up a Nuclear Safety Analysis...
Page 6 - ... even though there is some tendency to require this by regulation. Some remedies can preempt or conflict with others, and even useful ones may have widely different benefits and priorities. Somewhere in between these extremes there are a few very important remedies which can apply to most plants — and a few more which may apply selectively to some plant designs but not to others. Many other proposed remedies may range from convenience to cosmetic or even can be counterproductive or in conflict...
Page 71 - States, and some overseas, who, along with NSAC, have attempted to do the thermal-hydraulic analysis of the TMI accident. They met for several days to review status of these calculations and methods. A "Disturbance analysis System" workshop was held to cover possible information aids for reactor operation.