Report of the Chief of Engineers U.S. ArmyU.S. Government Printing Office, 1878 |
From inside the book
Results 1-5 of 100
Page 37
... dredging on the Middle Ground , under which considerable progress had then been made . During the past year the removal of the ledge in the Middle Ground Channel has been carried on under contract , and has been about half completed by ...
... dredging on the Middle Ground , under which considerable progress had then been made . During the past year the removal of the ledge in the Middle Ground Channel has been carried on under contract , and has been about half completed by ...
Page 38
... dredging and rock excavation at an estimated cost of $ 35,000 . By the river and harbor act of August 14 , 1876 , the sum of $ 5,000 was appropriated for the improvement of this harbor , which was applied to the partial removal of the ...
... dredging and rock excavation at an estimated cost of $ 35,000 . By the river and harbor act of August 14 , 1876 , the sum of $ 5,000 was appropriated for the improvement of this harbor , which was applied to the partial removal of the ...
Page 39
... dredging in front of the harbor commissioner's line above Merrill's wharf ; but this work will be done only on condition that the several wharves above Merrill's wharf will be removed , so far as they extend beyond the harbor line . The ...
... dredging in front of the harbor commissioner's line above Merrill's wharf ; but this work will be done only on condition that the several wharves above Merrill's wharf will be removed , so far as they extend beyond the harbor line . The ...
Page 42
... dredging , of the southern portion of this spit , so as to give to the chan- nel a width of 600 feet for a depth of 23 feet at mean low - water . Under a contract made in September , 1874 , the dredging , which was commenced in October ...
... dredging , of the southern portion of this spit , so as to give to the chan- nel a width of 600 feet for a depth of 23 feet at mean low - water . Under a contract made in September , 1874 , the dredging , which was commenced in October ...
Page 44
... dredging and 80 cubic yards of ledge excavation . This work has been completed . From the report of the engineer officer in charge , it is seen that nearly all the works hitherto projected for the improvement of Boston Harbor have been ...
... dredging and 80 cubic yards of ledge excavation . This work has been completed . From the report of the engineer officer in charge , it is seen that nearly all the works hitherto projected for the improvement of Boston Harbor have been ...
Other editions - View all
Common terms and phrases
00 July act approved June Amount appropriated amount available amount expended annual report Appendix appropriated by act approved June 18 August 14 bank boats bridge canal channel charge Chief of Engineers commenced completion of existing Connecticut River construction contract Corps of Engineers cost cubic yards depth dike distance dredging east base ending June 30 Enfield excavation existing project expended during fiscal expended in fiscal feet at mean feet per second feet wide fiscal year ending foot freshets G. K. WARREN Hartford zero Height of surface high-water inches Island ity per second jetties lock Mean in vertical mean low-water Mean velocity miles Mississippi River Missouri River Money statement mouth navigation obstructions pier plane by observed Point port profitably expended proposed removed repairs required for completion riprap rock season shoal slope snags stone survey thousand dollars tide Total velocity of river vertical plane vessels Warehouse Point water above Hartford width wing-dams
Popular passages
Page 163 - That nothing in this act shall be so construed as to repeal or modify any of the provisions of law now existing in reference to the protection of the navigation of rivers, or to exempt this bridge from the operation of the same.
Page 163 - ... shall be made and all such obstructions be removed at the expense of the owner or owners of said bridge.
Page 348 - It will be observed that the standing on each subject is multiplied by the weight given that subject and the product placed in the third column, and the sum of these products, divided by the sum of the weights, gives the general average standing.
Page 174 - Where said works are done by contract, such contract shall be made after sufficient public advertisement for proposals, in such manner and form as the Secretary of War shall prescribe; and such contracts shall be made with the lowest responsible bidders, accompanied by such securities as the Secretary of War shall require, conditioned for the faithful prosecution and completion of the work according to such contract^ and for the prompt payment of all liabilities incurred in the prosecution thereof...
Page 176 - War a relinquishment of all claim to the deferred payment of two hundred and fifty thousand dollars provided by the hereinbefore recited act to be paid when a channel twentyfour feet in depth and not less than two hundred and fifty feet in width shall have been maintained...
Page 167 - ... forage in kind may be furnished to the officers of the Army by the Quartermaster's Department, only for horses owned and actually kept by such officers in the performance of their official military duties when on duty with troops in the field or at such military posts west of the Mississippi River...
Page 163 - ... security of navigation of said river as the Secretary of War shall prescribe; and, to secure that object, the said company or corporation shall submit to the Secretary of War, for his examination and approval, a design and drawings of the bridge, and a map of the location, giving, for the...
Page 178 - For geographical surveys of the territory of the United States west of the one hundredth meridian...
Page 670 - N i. IMPROVEMENT OF THE MISSISSIPPI RIVER BETWEEN THE MOUTHS OF THE ILLINOIS AND OHIO RIVERS. BETWEEN THE ILLINOIS AND MISSOURI RIVERS. The...
Page iii - Congress. A consideration of actual methods and expenses of all surveys of a scientific character under the War and Interior Departments and the surveys of the Land Office, was referred at the last session of Congress (in the act providing for the sundry civil expenses of the government, approved June 20, 1878) to the National Academy of Sciences, with directions to report to Congress a plan for surveying and mapping the Territories of the United States on such general system as will secure the best...