Construction ContractsPractising Law Institute, 1975 - 328 pages |
From inside the book
Results 1-3 of 7
Page 27
... followed by contractor and owner a . Requirements may be found to have been waived if a dispute arises sub- sequently between owner and contrac- tor respecting payment for claimed change and the owner had knowledge of the change and ...
... followed by contractor and owner a . Requirements may be found to have been waived if a dispute arises sub- sequently between owner and contrac- tor respecting payment for claimed change and the owner had knowledge of the change and ...
Page 57
... followed the plans and specifications provided by the architect or engineer in accordance with his con- tractual obligation . The manufacturer predictably contends that the product was not intended to be used in the manner specified by ...
... followed the plans and specifications provided by the architect or engineer in accordance with his con- tractual obligation . The manufacturer predictably contends that the product was not intended to be used in the manner specified by ...
Page 259
... followed because of some act on the part of the owner or some other party to the litigation . The supporting evidence upon which such charts are based must be introduced into evi- dence , as noted above , either through the use of a ...
... followed because of some act on the part of the owner or some other party to the litigation . The supporting evidence upon which such charts are based must be introduced into evi- dence , as noted above , either through the use of a ...
Contents
Practical Problems and Legal Trouble Spots | 31 |
Planning to Avoid Construction Litigation | 49 |
I | 65 |
Copyright | |
7 other sections not shown
Common terms and phrases
8th Cir A.I.A. general conditions accepted agreement amount approval arbi Archi Architect Article award bid shopping bidder Board bond breach of contract Cal.Rptr cause claims Classroom Building clause construction contract CONSTRUCTION LITIGATION construction manager consumer Contract Documents Contractor Corp cost court defects disputes Dist drawings and specifications engineer equipment expense fact failure Federal Flan Floor Plan furnished Ground Floor indemnity installation Insurance jury liability lien limited liquidated damages materials medical malpractice ment Minn negligence owner panel parties payment performance Peter Kiewit Sons Pima County Plan East Wing plans and specifications problems reasonable remedy responsible Restatement of Contracts result rules schedule Sept shop drawings Small Claims Court standard statutes strict liability subcontractor submitted Supp suppliers surety tect temporary tion tractor trial United warranty West Wing