Page 27
... change order ( AIA A - 201 , Par- agraph 12.1.6 ) Contractor may make claim for increase in contract amount ; notice ... changes should be closely followed by contractor and owner a . Requirements may be found to have been waived if a ...
... change order ( AIA A - 201 , Par- agraph 12.1.6 ) Contractor may make claim for increase in contract amount ; notice ... changes should be closely followed by contractor and owner a . Requirements may be found to have been waived if a ...
Page 126
... changes in specifi- cations with adjustment for differences in cost or time . The former provision permitted owner to change the design so as to control costs in light of the conditions unexpectedly encountered , but the owner elected ...
... changes in specifi- cations with adjustment for differences in cost or time . The former provision permitted owner to change the design so as to control costs in light of the conditions unexpectedly encountered , but the owner elected ...
Page 209
... changes . - INTERPRETATIONS : DRAWINGS AND SPECIFICATIONS Drawings and Specifications are intended to agree and be ... change the design of any architectural details shown on the contract documents without additional cost , provided that ...
... changes . - INTERPRETATIONS : DRAWINGS AND SPECIFICATIONS Drawings and Specifications are intended to agree and be ... change the design of any architectural details shown on the contract documents without additional cost , provided that ...
Contents
Practical Problems and Legal Trouble Spots | 31 |
Planning to Avoid Construction Litigation | 49 |
I | 65 |
Copyright | |
7 other sections not shown
Common terms and phrases
8th Cir A.I.A. general conditions accepted agreement amount approval arbi Archi Architect Article award bid shopping bidder Board bond breach of contract Cal.Rptr cause claims Classroom Building clause construction contract CONSTRUCTION LITIGATION construction manager consumer Contract Documents Contractor Corp cost court defects disputes Dist drawings and specifications engineer equipment expense fact failure Federal Flan Floor Plan furnished Ground Floor indemnity installation Insurance jury liability lien limited liquidated damages materials medical malpractice ment Minn negligence owner panel parties payment performance Peter Kiewit Sons Pima County Plan East Wing plans and specifications problems reasonable remedy responsible Restatement of Contracts result rules schedule Sept shop drawings Small Claims Court standard statutes strict liability subcontractor submitted Supp suppliers surety tect temporary tion tractor trial United warranty West Wing