Page 8
... base cracks . The mixture showed from 24 to 27 per cent of material passing the 200 - mesh screen , with the ordinary sand grading which is con- sidered proper for sheet asphalt work . ( Returns to manuscript . ) With these dense , high ...
... base cracks . The mixture showed from 24 to 27 per cent of material passing the 200 - mesh screen , with the ordinary sand grading which is con- sidered proper for sheet asphalt work . ( Returns to manuscript . ) With these dense , high ...
Page 19
... BASE STABILITY TEST ASSEMBLY ( Figure 2 ) diameter . A plunger is placed on the top of the briquette and a rapidly increasing load applied until the maximum load re- quired to force the mixture through the orifice is reached . The ...
... BASE STABILITY TEST ASSEMBLY ( Figure 2 ) diameter . A plunger is placed on the top of the briquette and a rapidly increasing load applied until the maximum load re- quired to force the mixture through the orifice is reached . The ...
Page 49
... , in the heart of the retail shopping district , paved with concrete in 1923. The concrete is laid on top of a concrete base , replacing a brick surface ( 28 ) ( Illustration 28 ) Los Angeles ,. STREET PAVING AND DESIGN 49.
... , in the heart of the retail shopping district , paved with concrete in 1923. The concrete is laid on top of a concrete base , replacing a brick surface ( 28 ) ( Illustration 28 ) Los Angeles ,. STREET PAVING AND DESIGN 49.
Page 94
... base with the key - block pavement . There was immediate relief from noise and slipperiness and although the pavement has been subjected to heavy cross - boro traffic for six years the expense of repairs has been about $ 100 on three ...
... base with the key - block pavement . There was immediate relief from noise and slipperiness and although the pavement has been subjected to heavy cross - boro traffic for six years the expense of repairs has been about $ 100 on three ...
Page 97
... base , with no artificial drainage , and subjected to frequent cutting for all sub - surface structures , have been taken up and relaid on renewed base courses , the brick seemingly good enough for another generation of use . These ...
... base , with no artificial drainage , and subjected to frequent cutting for all sub - surface structures , have been taken up and relaid on renewed base courses , the brick seemingly good enough for another generation of use . These ...
Contents
1 | |
30 | |
116 | |
132 | |
139 | |
169 | |
177 | |
196 | |
376 | |
389 | |
400 | |
417 | |
432 | |
454 | |
464 | |
473 | |
208 | |
216 | |
235 | |
248 | |
260 | |
270 | |
300 | |
309 | |
317 | |
324 | |
338 | |
346 | |
360 | |
503 | |
506 | |
512 | |
518 | |
550 | |
557 | |
564 | |
576 | |
590 | |
596 | |
603 | |
647 | |
Other editions - View all
Common terms and phrases
aggregate American amount asphalt Association Avenue average base Board bond brick Building carried cement cent Chairman Chicago City Engineer City Plan Cleveland collection Commission Committee Company completed concrete consideration construction Consulting contract contractor cost Department direct discussion district effect entire equipment fact feet filters garbage give given haul Highway important improvement inches increase interest joint lamp less limits load Louis material matter ment method Michigan miles mixture Moines Municipal necessary operation Park pass pavement paving period plant possible practically present President production recommended removal Representative river road sand sewer shows side sludge Society South specifications standard street lighting surface tanks tion traffic trailers trucks units West yards York City
Popular passages
Page 537 - The owner shall have the right, prior to the signing of the contract, to require the contractor to furnish bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, in such form as the owner may prescribe and with such sureties as he may approve.
Page 426 - Wherefore do ye spend money for that which is not bread? and your labor for that which satisfieth not? hearken diligently unto Me, and eat ye that which is good, and let your soul delight itself in fatness.
Page 533 - If no schedule or agreement stating the dates upon which drawings shall be furnished is made, then no claim for delay shall be allowed on account of failure to furnish drawings until two weeks after demand for such drawings and not then unless such claim be reasonable. This article does not exclude the recovery of damages for delay by either party under other provisions in the contract documents.
Page 531 - If such alterations diminish the quantity of work to be done they shall not constitute a claim for damages, or for anticipated profits on the work that may be dispensed with...
Page 535 - ORDER OF COMPLETION; USE OF COMPLETED PORTIONS. The Contractor shall complete any portion or portions of the work in such order of time as the Engineer may require. The Company shall have the right to take possession of and use any completed or partially completed portions of the work notwithstanding the time for completing the entire work or such portions may not have expired ; but such taking possession and use shall not be deemed an acceptance of the work so taken or used or any part thereof.
Page 496 - General. The asphalt filler shall be homogeneous, free from water and shall not foam when heated to 200 deg.
Page 534 - Owner, upon the certificate of the Architect that sufficient cause exists to justify such action, may, without prejudice to any other right or remedy and after giving the Contractor, and his surety if any, seven days...
Page 483 - Standard Methods of Making and Storing Specimens of Concrete in the Field...
Page 536 - Liability Insurance.— The Contractor shall maintain such insurance as will protect him from claims under workmen's compensation acts and from any other claims for damages for personal injury, including death, which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor or anyone directly or indirectly employed by either of them.