Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1953 |
From inside the book
Results 1-5 of 100
Page 1002
... previous projects . Total to June 30 , 1953 , includ- ing fiscal years prior to 1949 13 $ 83 , 171 , 142. 24 81 , 702 , 829.38 81 , 698 , 954. 60 35 , 971 , 288. 19 35,969 , 638.01 35 , 969 , 638.01 In addition , $ 87,083.31 for new ...
... previous projects . Total to June 30 , 1953 , includ- ing fiscal years prior to 1949 13 $ 83 , 171 , 142. 24 81 , 702 , 829.38 81 , 698 , 954. 60 35 , 971 , 288. 19 35,969 , 638.01 35 , 969 , 638.01 In addition , $ 87,083.31 for new ...
Page 1012
... fiscal year . Costs incurred by hired labor were $ 120,592.38 , of which $ 81,398.63 was for preliminary en- gineering and design , $ 15,337.21 for repairs prior to completion of project , and $ 23,856.54 for emergency repairs of levee ...
... fiscal year . Costs incurred by hired labor were $ 120,592.38 , of which $ 81,398.63 was for preliminary en- gineering and design , $ 15,337.21 for repairs prior to completion of project , and $ 23,856.54 for emergency repairs of levee ...
Page 1013
... fiscal year . Costs incurred by hired labor were $ 38,514.01 , of which $ 38,454.64 was for preliminary engi- neering and design , and $ 59.37 for repair prior ... years prior to 1949 13 $ 3 , 891 , 000.00 3 , 897 , 575.89 3 , 897 ...
... fiscal year . Costs incurred by hired labor were $ 38,514.01 , of which $ 38,454.64 was for preliminary engi- neering and design , and $ 59.37 for repair prior ... years prior to 1949 13 $ 3 , 891 , 000.00 3 , 897 , 575.89 3 , 897 ...
Page 1017
... prior to completion of project , and $ 7.09 for preparation of maintenance manuals . Con- tractors constructed ... fiscal year . Construction on the existing pro- ject was initiated in January 1948 , and the project was ready for ...
... prior to completion of project , and $ 7.09 for preparation of maintenance manuals . Con- tractors constructed ... fiscal year . Construction on the existing pro- ject was initiated in January 1948 , and the project was ready for ...
Page 1018
United States. Army. Corps of Engineers. Condition at end of fiscal year . Construction was initiated on the existing ... prior to 1949 1 $ 1,049 , 985.06 933 , 748.65 933 , 748.65 $ 78 , 287.82 78 , 287.82 183 , 014. 94 21 ...
United States. Army. Corps of Engineers. Condition at end of fiscal year . Construction was initiated on the existing ... prior to 1949 1 $ 1,049 , 985.06 933 , 748.65 933 , 748.65 $ 78 , 287.82 78 , 287.82 183 , 014. 94 21 ...
Other editions - View all
Common terms and phrases
1st sess 2d sess 80th Congress acre-feet Allegheny River Annual Report breakwater bridge Calif Chief of Engineers Condition at end Cong construction contract contributed funds Control Act approved cooperation Cost and financial costs and expenditures County Creek cubic yards district drainage dredging end of fiscal ending June 30 entrance channel Estimated additional amount existing project feet deep feet long feet wide financial summary Fiscal Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor House Public includ July 24 June 28 June 30 latest published map levee Location locks and dams low water datum miles Mississippi River Missouri River mittee resolution mouth navigation Ohio River Operations and results Oreg percent complete pier previous projects project depth project was authorized provides Report for 1938 reservoir results during fiscal River and Harbor San Joaquin River total cost Total to June turning basin United Wabash River Willamette River
Popular passages
Page 1178 - The sum of $25,000,000 is authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 1570 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 1408 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1349 - That the sum of $12,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers for the repair, restoration, and strengthening of levees and other flood-control works which have been threatened or destroyed by the recent floods, or which may be threatened or destroyed by later floods, and for completion of work begun under the Acts entitled "An Act to provide for emergency flood-control...
Page 1293 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as, in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1025 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1230 - States, or municipalities; and provided further, tnat in case high dams are built before the United States shall have built the projected locks and low dams which are to be replaced, the United States shall contribute to the cost of the substituted structures an amount equal to the estimated cost of the work of navigation for which substitution is made.
Page 1393 - The Flood Control Act of June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No.
Page 1127 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1085 - The improvement is subject to the conditions that local interests make a cash contribution of $40,000 toward the construction cost, and give assurances satisfactory to the Secretary of War that they will provide, without cost to the United States, all lands, easements, and rights-of-way necessary for the construction of the project...