Page 64
... dredging of this channel . Under that contract the removal of the spit off Leadurney Point was completed , and some dredging was done at the lower end of the bar near the " Western Bar Beacon , " after which ( in March , 1880 ) the ...
... dredging of this channel . Under that contract the removal of the spit off Leadurney Point was completed , and some dredging was done at the lower end of the bar near the " Western Bar Beacon , " after which ( in March , 1880 ) the ...
Page 81
... dredging to 43 feet at mean low - water , with the expectation that at high - water the depth would be 9 feet . This was based upon the rise of tide of 54 feet as determined at Dighton . In 1872 observations were made for rise of tide ...
... dredging to 43 feet at mean low - water , with the expectation that at high - water the depth would be 9 feet . This was based upon the rise of tide of 54 feet as determined at Dighton . In 1872 observations were made for rise of tide ...
Page 89
... dredging will have to be continued till the other is completed . During the fiscal year ending June 3 , 1882 , about $ 8,000 was ex- pended at Saybrook on the jetties in building up low places , and in dredging test pits to ascertain ...
... dredging will have to be continued till the other is completed . During the fiscal year ending June 3 , 1882 , about $ 8,000 was ex- pended at Saybrook on the jetties in building up low places , and in dredging test pits to ascertain ...
Page 91
... dredging , the material removed being sand and gravel mixed with large bowlders . The total amount appropriated for this work to the present date is $ 6,800 , of which $ 2,500 had been expended June 30 , 1881 , in making a depth of 16 ...
... dredging , the material removed being sand and gravel mixed with large bowlders . The total amount appropriated for this work to the present date is $ 6,800 , of which $ 2,500 had been expended June 30 , 1881 , in making a depth of 16 ...
Page 107
... Dredging has also been done at the Middle Ground , and rock - blasting at Whitehead's Sand Dock . There has been expended during the fiscal year ending June 30 , 1882 , $ 61,140.30 . The dredging has been completed at the Middle Ground ...
... Dredging has also been done at the Middle Ground , and rock - blasting at Whitehead's Sand Dock . There has been expended during the fiscal year ending June 30 , 1882 , $ 61,140.30 . The dredging has been completed at the Middle Ground ...
Other editions - View all
Common terms and phrases
00 Amount available 00 Amount estimated 00 See Appendix 12 feet act of March act passed August Amount appropriated amount available amount expended appropriated by act Appropriation asked available for fiscal batteries beach Board of Engineers breakwater bridge canal channel Chief of Engineers commenced completion of existing Congress construction Continuing improvement contract Corps of Engineers Creek cubic yards defense Delaware River dike dredging ending June 30 entrance exclusive of outstanding expended during fiscal expended in fiscal expended to June feet at mean feet deep feet wide fiscal year ending Frankford Creek harbor act harbor of refuge Island jetty June 14 Lake Lieut mean low-water miles Mississippi River mouth navigation obstructions outstanding liabilities July piers port present project profitably expended proposed removal repairs required for completion river and harbor Rock Secretary of War shoal shore snags survey thousand dollars tion tons Total vessels wharf width Willets Point
Popular passages
Page 366 - That any bridge constructed under this Act and according to its limitations shall be a lawful structure, and shall be recognized and known as a post route, upon which also no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States, than the rate per mile paid for their transportation over the railroads or public highways leading to said bridge; and the United States shall have the right of way for postal telegraph purposes...
Page 357 - War, for his examination and approval, л design and drawings of the bridge, and a map of the location, giving, for the space of one mile above and one mile below the proposed location, the topography of the banks of the river, the shore- lines at high and low water, the direction and strength of the currents at all stages, and the soundings, accurately showing the bed of the stream...
Page 358 - ... at all stages, and the soundings, accurately showing the bed of the stream, the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject ; and until the said plan and location of the bridge are approved by the...
Page 357 - ... as will effectually obviate such obstruction ; and all such alterations shall be made and all such obstructions be removed at the expense of the owner or owners of said bridge. And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river, caused or alleged to be...
Page 367 - ... the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject; and until the said plan and location of the bridge are approved by the Secretary of War...
Page 367 - That nothing in this act shall be so construed as to repeal or modify any of the provisions of law now existing in reference to the protection of the navigation of rivers, or to exempt this bridge from the operation of the same.
Page 372 - That any bridge constructed under this act, and according to its limitations, shall be a lawful structure, and shall be recognized and known as a post-route, upon which, also, no higher charge shall be made for the transmission over the same of the mails, the troops, and the munitions of war of the United States than the rate per mile paid for the transportation over the railroads or public highways leading to said bridge...
Page 396 - An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes...
Page 365 - ... made for the transmission over the same of the mails, the troops, and the munitions of war of the United States, than the rate per mile paid for the transportation over the railroads or public highways leading to said bridge; and said bridge shall enjoy the rights and privileges of other post-routes in the United States; and Congress reserves the right at any time to regulate by appropriate legislation the charges for freight and passengers over said bridge.
Page 355 - That all railway companies desiring to use said bridge shall have and be entitled to equal rights and privileges in the passage of the same, and in the use of the machinery and fixtures thereof, and of all the approaches thereto, under and upon such terms and conditions as shall be prescribed by the Secretary of War, upon hearing the allegations and proofs of the parties, in case they shall not agree.