Professional Construction ManagementMcGraw-Hill, 1978 - 453 pages |
From inside the book
Results 1-3 of 53
Page 57
... steel contractor . 3 Structural steel Includes furnishing and erection of all structural steel , including the metal roof deck . Does not include miscellaneous steel that is not fully designed at this time . 4 Precast concrete walls ...
... steel contractor . 3 Structural steel Includes furnishing and erection of all structural steel , including the metal roof deck . Does not include miscellaneous steel that is not fully designed at this time . 4 Precast concrete walls ...
Page 190
... Steel Erection Crew 1 Foreman 1 @ 17.50 17.50 4 Ironworkers 4 @ 15.75 63.00 1 Operator 1 @ 17.50 17.50 1 Oiler 1 @ 14.75 14.75 2 Ironworkers 2 @ 15.75 31.50 9 Total Crew 9 Hr @ 16.03 = 144.25 Furnish Fab Steel 480 T L.S. Erect struct .
... Steel Erection Crew 1 Foreman 1 @ 17.50 17.50 4 Ironworkers 4 @ 15.75 63.00 1 Operator 1 @ 17.50 17.50 1 Oiler 1 @ 14.75 14.75 2 Ironworkers 2 @ 15.75 31.50 9 Total Crew 9 Hr @ 16.03 = 144.25 Furnish Fab Steel 480 T L.S. Erect struct .
Page 258
... steel and bent - and - tagged reinforcing steel . In terms of bulk materials , however , such as raw stocks of lumber , unfabricated reinforcing steel , and small pipe , this level of detail is seldom desirable and generally is not even ...
... steel and bent - and - tagged reinforcing steel . In terms of bulk materials , however , such as raw stocks of lumber , unfabricated reinforcing steel , and small pipe , this level of detail is seldom desirable and generally is not even ...
Contents
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Organization for Professional Construction | 33 |
Copyright | |
19 other sections not shown
Other editions - View all
Common terms and phrases
activities actual Agreement alternative applicable approach Architect Architect/Engineer ARTICLE award bar chart basic bid packages bidders budget building Change Order Chapter completion concepts concrete construction contracts Construction Cost Construction Division Construction Manager's control system cost code cost engineering critical path methods curve design-construct detail developed earthwork economic employees equipment evaluation example facilities factors fair-cost estimate field construction manager Figure Guaranteed Maximum Price home office HVAC industry inspection kg/cm² L. D. Miles materials ment methods Mountaintown Warehouse negotiated operations organization overall Owner payment percent performance phased construction planning and control plans and specifications preliminary prepared procedures procurement productivity professional construction manager progress project cost Project Manager proposed Public Buildings Service quality control quantities reports responsibilities safety and health schedule shop drawings standard Structural steel Subcontractor summary tion Total Trade Contractors unassigned Value Engineering