Professional Construction ManagementMcGraw-Hill, 1978 - 453 pages |
From inside the book
Results 1-3 of 38
Page 186
... floor area 30,000 sf 256,900 sf 2. Gross area supported ( excl . slab on grade ) 30,000 sf 256,900 sf 3. Total basement floor area 2,000 sf 4. Roof area ..... 10,000 sf 256,900 sf 5. Not finished area 14. Parking area OTHER MEASURES ...
... floor area 30,000 sf 256,900 sf 2. Gross area supported ( excl . slab on grade ) 30,000 sf 256,900 sf 3. Total basement floor area 2,000 sf 4. Roof area ..... 10,000 sf 256,900 sf 5. Not finished area 14. Parking area OTHER MEASURES ...
Page 226
... floor . They read from left to right , and list the operations on each floor roughly in chronological order . The descriptions are given at the top of the columns . In a sense , the building's schedule then proceeds from the lower left ...
... floor . They read from left to right , and list the operations on each floor roughly in chronological order . The descriptions are given at the top of the columns . In a sense , the building's schedule then proceeds from the lower left ...
Page 246
... floor To 9th floor Windows & facing panels 71 1st to 6th floor Form & concrete to roof center block # 58 / 1 3/4 wk To 15th floor To 12th floor 73 76 1/2 wk 74 # 58 / 2 To 9th floor Figure 12-18 Portion of time - scaled factual network ...
... floor To 9th floor Windows & facing panels 71 1st to 6th floor Form & concrete to roof center block # 58 / 1 3/4 wk To 15th floor To 12th floor 73 76 1/2 wk 74 # 58 / 2 To 9th floor Figure 12-18 Portion of time - scaled factual network ...
Contents
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Organization for Professional Construction | 33 |
Copyright | |
19 other sections not shown
Other editions - View all
Common terms and phrases
activities actual Agreement alternative applicable approach Architect Architect/Engineer ARTICLE award bar chart basic bid packages bidders budget building Change Order Chapter completion concepts concrete construction contracts Construction Cost Construction Division Construction Manager's control system cost code cost engineering critical path methods curve design-construct detail developed earthwork economic employees equipment evaluation example facilities factors fair-cost estimate field construction manager Figure Guaranteed Maximum Price home office HVAC industry inspection kg/cm² L. D. Miles materials ment methods Mountaintown Warehouse negotiated operations organization overall Owner payment percent performance phased construction planning and control plans and specifications preliminary prepared procedures procurement productivity professional construction manager progress project cost Project Manager proposed Public Buildings Service quality control quantities reports responsibilities safety and health schedule shop drawings standard Structural steel Subcontractor summary tion Total Trade Contractors unassigned Value Engineering