Professional Construction ManagementMcGraw-Hill, 1978 - 453 pages |
From inside the book
Results 1-3 of 80
Page 54
... drawings were prepared to describe the new warehouse . A comprehensive set of technical specifications was also required . The following drawings are reproduced in Appendix A : 2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 ...
... drawings were prepared to describe the new warehouse . A comprehensive set of technical specifications was also required . The following drawings are reproduced in Appendix A : 2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 ...
Page 352
Donald S. Barrie, Boyd C. Paulson. 3. Engineering Drawings The following drawings are included : Foundation and Floor Plans , and Finish Schedule Drawing SI - 1 Plot Plan and Utility Plan Drawing A - 1 Drawing A - 2 Roof Framing , Plan ...
Donald S. Barrie, Boyd C. Paulson. 3. Engineering Drawings The following drawings are included : Foundation and Floor Plans , and Finish Schedule Drawing SI - 1 Plot Plan and Utility Plan Drawing A - 1 Drawing A - 2 Roof Framing , Plan ...
Page 393
... Drawings and Samples : In collaboration with the Architect / Engineer , establish and implement procedures for expediting the processing and approval of shop drawings and samples . 2.2.11 Reports and Project Site Documents : Record the ...
... Drawings and Samples : In collaboration with the Architect / Engineer , establish and implement procedures for expediting the processing and approval of shop drawings and samples . 2.2.11 Reports and Project Site Documents : Record the ...
Contents
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Organization for Professional Construction | 33 |
Copyright | |
19 other sections not shown
Other editions - View all
Common terms and phrases
activities actual Agreement alternative applicable approach Architect Architect/Engineer ARTICLE award bar chart basic bid packages bidders budget building Change Order Chapter completion concepts concrete construction contracts Construction Cost Construction Division Construction Manager's control system cost code cost engineering critical path methods curve design-construct detail developed earthwork economic employees equipment evaluation example facilities factors fair-cost estimate field construction manager Figure Guaranteed Maximum Price home office HVAC industry inspection kg/cm² L. D. Miles materials ment methods Mountaintown Warehouse negotiated operations organization overall Owner payment percent performance phased construction planning and control plans and specifications preliminary prepared procedures procurement productivity professional construction manager progress project cost Project Manager proposed Public Buildings Service quality control quantities reports responsibilities safety and health schedule shop drawings standard Structural steel Subcontractor summary tion Total Trade Contractors unassigned Value Engineering