Professional Construction ManagementMcGraw-Hill, 1978 - 453 pages |
From inside the book
Results 1-3 of 18
Page 192
... guaranteed maximum - price , and cost - plus - a - fee negotiated contracts . On lump - sum projects , the definitive estimate can be developed , in the absence of changed conditions , using the low bidder's quotation plus an evaluated ...
... guaranteed maximum - price , and cost - plus - a - fee negotiated contracts . On lump - sum projects , the definitive estimate can be developed , in the absence of changed conditions , using the low bidder's quotation plus an evaluated ...
Page 395
... Maximum Price is established , as provided for in Article 6 , a Date of Substantial Completion of the project shall ... Guaranteed Maximum Price 6.1 When the design , Drawings and Specifications are sufficiently complete , the ...
... Maximum Price is established , as provided for in Article 6 , a Date of Substantial Completion of the project shall ... Guaranteed Maximum Price 6.1 When the design , Drawings and Specifications are sufficiently complete , the ...
Page 398
... Guaranteed Maximum Price and the Construction Completion Date shall be equitably adjusted by Change Order upon claim by either party made within a reasonable time after the first observance of the conditions . 9.2 Claims for Additional Cost ...
... Guaranteed Maximum Price and the Construction Completion Date shall be equitably adjusted by Change Order upon claim by either party made within a reasonable time after the first observance of the conditions . 9.2 Claims for Additional Cost ...
Contents
The Nature of the Construction Industry | 6 |
What Is Professional Construction Management? | 13 |
MANAGEMENT IN PRACTICE | 15 |
Copyright | |
25 other sections not shown
Other editions - View all
Common terms and phrases
activities actual Agreement alternative applicable approach approval Architect Architect/Engineer award bar chart basic bid packages bidders budget building Change Order Chapter completion concepts concrete construction contract construction cost Construction Manager's construction phase construction project contract packages control system cost code cost engineering Critical Path Method design and construction design-construct detailed developed documents earthwork economic equipment evaluation example facilities factors fair-cost estimate Field Construction Manager Figure Guaranteed Maximum Price home office home-office HVAC industry inspection kg/cm² labor lump-sum materials ment methods negotiated operations organization overall owner payment percent performance phased construction program plans and specifications Precast preliminary prepared procedures productivity professional construction manager progress project cost Project Manager proposed Public Buildings Service quality control reports responsibilities safety and health scope shop drawings standard Structural steel subcontractors summary tion Total Trade Contractors unassigned utilities Value Engineering