Page images
PDF
EPUB
[blocks in formation]

The inspection of the gauges has been in charge of Mr. L. P. Butler, assistant engineer, who has made three complete tours of inspection between the mouth and Sioux City during the year, one in September, 1893, one in November-December, 1893, and one in May-June, 1894; in addition to the work connected directly with the gauges he has made measurements of two bridges, completed during the year, conducted two special surveys, and aided in the gathering of commercial statistics. The gauges at the present time are all in good condition, and only two entire renewals at Dewitt, Mo., and Brownville, Nebr.,-were necessary during the year. A new permanent gauge was established March 13, 1894, on Bellefontaine bridge. All the other gauges have been kept in good repair at slight expense.

Level connections between the gauge bench marks and those of the precise level lines having been completed, the graduations on all the gauges were made to read precise level elevations above the St. Louis directrix during the November-December inspection.

The pilot bulletin service for 1893 was discontinued on November 30, except for the Kansas City station, where it was made continuous at the request of local steamboat owners.

The service for 1894 was resumed on March 16 at the permanent gauge stations between St. Charles and Kansas City, and on April 16 an additional bulletin was displayed on the new Bellefontaine bridge, for which two of the larger size of frames had been provided. A slight change was made in the design of the bulletin frames for the Bellefontaine bridge at the instance of Mr. George S. Morison, chief engineer, which better adapted them for attachment to the bridge.

During the year 1893 the bulletins read from a stage 5.1 feet below a mean stage of the navigable low waters at each station, this stage having been taken in order that the Missouri River Commission bulletin readings should agree with the daily published records of the Weather Bureau at Kansas City. After the gauges were changed to read precise level elevations it was found that the equating number at Kansas City required a change to 5 feet, and accordingly all the bulletins except at Randolph bridge now read from a zero which is 5 feet below a mean of observed navigable low water, as near as the data at hand allows the mean to be determined. The exception noted at Randolph bridge appeared to be necessary, as its bulletin record of the year 1893 would sometimes show a higher stage on the same day than at Kansas City, 4 miles above; this may be accounted for by the change in slope between the two stations resulting from works of channel rectification and by an insufficient number of subsequent low-water gauge heights.

The pilot bulletins are now exhibiting one daily reading in accordance with the 6 a. m. stage from zeros as follows:

[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed]

The zero elevation of the Weather Bureau gauge at Hermann is at present 71.23; but this value only holds good up to the 13-foot mark, above which the gauge is wrongly graduated, each foot recorded being actually equal to about 0.876.

According to the rule adopted by the Commission the Hermann gauge should read from a zero of 68.35. The zero of this gauge has not been kept constant, having been as low as 67.34 previous to 1886, when it was changed to its present elevation In connection with the determination of the mean navigable low waters, some study has been made, since the precise levels have been available, in an endeavor to trace a law connecting length of river with mean gauge heights.

The investigation has not yet been completed, but it has been carried far enough to show that, using the average distances above the mouth as measured on the lowwater channel lines from the maps of 1878-79 and 1890 as abscissa (r), the height of the mean navigable low water in that portion of the river from a point above the mouth of Osage River to Rulo, Nebr., may be determined closely by the equation of the straight line y=0.812x-7. The mean high water, for the same portion of the river may be approximately expressed by a similar formula of y=0.812x+7.4 at all the stations except where there are large tributary streams, at which points a further addition of about 2.7 feet becomes necessary to the gauge heights.

On the portion of the river above Rulo no formula appears to be applicable, and on the lower portion the slope appears to increase and the formula changes. The gauge stations are quite far apart on these portions of the river, and perhaps with more data further study may reveal a practical result to an investigation which at present is only in a preliminary stage.

The bulletins, in addition to showing the daily stage of the river, also serve to give the available heights under bridges for passing steamboats, and cards explanatory of the service with a table for ascertaining this height from the bulletin reading have been issued to all steamboatmen interested.

The results of the precise levels have shown that all the stages published by the Missouri River Commission are more or less in error. These published stages are comprised in two pamphlets; one issued in 1886, entitled "Stages of the Missouri River from St. Charles to Fort Pierre, Dak., between 1872 and 1885," which was also published as Appendix A 6 of the annual report of the Missouri River Commission for the year ending June 30, 1886, and one pamphlet issued in 1890, entitled "Stages of the Missouri River from St. Charles, Mo., to Sioux City, Iowa, 1886 to 1889, both inclusive."

The following table gives the correction to be applied algebraically to each of the published records to reduce them to the precise level elevations:

[blocks in formation]
[blocks in formation]

The manuscript of a third pamphlet in the series of Missouri River stages, embracing the four years 1890 to 1893 inclusive, is now ready for the printer. No change has been made from the methods heretofore adopted for the permanent preservation of the gauge records, as described in last year's report. Very respectfully, your obedient servant,

A. H. BLAISDELL,
Assistant Engineer.

APPENDIX A 5.

REPORT ON RESULTS OF ROCK BORINGS IN MISSOURI RIVER VALLEY.

OFFICE MISSOURI RIVER COMMISSION,

St. Louis, Mo., June 30, 1894. SIR: I have the honor to hand you herewith a report on the results of rock borings in the Missouri River Valley. The placing on record of these results was inaugurated by my predecessor, and a detailed account of them may be found in the reports of the secretaries of the Commission. (See report of Chief of Engineers for 1890, p. 3375, and for 1892, p. 3261.)

Three additional sections of the valley have been collected during the past year as follows:

A section showing the depth at which a suitable stable foundation was struck on which to base the piers of the new Leavenworth bridge; two sections of a proposed new bridge at Jefferson City, Mo.; and an approximate section in the vicinity of St. Charles, Mo., on a site of a proposed bridge.

Each locality is accompanied by a map showing the location and number of borings taken.

The drawings show the results obtained quite as fully as any extended description would do, and similar conventional signs in addition to descriptive print have been used as in former reports.

Very respectfully, your obedient servant,

JAMES F. MCINDOE, Additional Second Lieut. of Engineers, Secretary.

Lieut. Col. CHAS. R. SUTER,

Corps of Engineers, U. S. A.,

President Missouri River Commission.

LEAVENWORTH, KANS.

Plate A.-This plate has been drawn from information furnished through the courtesy of Mr. A. J. Tullock, proprietor and engineer of the Missouri Valley Bridge and Iron Works, Leavenworth, Kans. The borings were made between January 16 and February 20, 1893, while the bridge was in course of construction.

Mr. Tullock states that in sinking Pier II “the sand was very clean and very fine, excepting where it was found with gravel. The gravel found in the caisson was very small."

In sinking the caisson for Pier IV many large logs were encountered; one log was found in sinking caisson II and none in sinking caisson III.

JEFFERSON CITY, MO.

Plate B.-This plate is a reproduction of drawings of borings taken between February 28 and March 15, 1894, obtained from Mr. J. A. L. Waddell, consulting and bridge engineer, Kansas City, Mo., by the permission of a company formed to bridge the river at this point.

The same method of making the borings was adopted as had been used at the Sibley bridge, and is fully explained in the report of the Missouri River Commission for 1890, p. 3379.

Borings were made on two crossings about 0.6 mile apart, four on each section, and were carried to bed rock in each instance.

The drawing contains all the information at hand in regard to strata passed through.

ST. CHARLES, MO.

Plate C.-This plate is also a reproduction of a drawing furnished by Mr. Waddell. The borings were made in 1892 and were not completed over the entire section on account of high water. The drawing exhibits the strata passed through in making the two borings.

APPENDIX A 6.

ANNUAL REPORT OF J. A. SEDDON, ASSISTANT ENGINEER, 1894.
OFFICE MISSOURI RIVER COMMISSION,
St. Louis, Mo., June 30, 1894.

SIR: I have the honor to submit the following report on the study of physical data for the fiscal year ending June 30, 1894:

The study of flood movement by the method of "extension gange relations," completed in the Lower Mississippi, has been carried up the Missouri to Kansas City, through all the gauge records to date. While in general the movement is similar to that of the Lower Mississippi, yet there are irregularities in the Missouri which are not fully understood. It is hoped that further light will be thrown on these by the extension of the study to Sioux City, when this will be made the subject of a special report.

A preliminary study by gauge relations was made of Missouri River regimen from Kansas City down. This study of regimen is based on the idea that between two gauges all the hydraulic properties of the channel through the whole reach, from low to high water, are summed up and given graphically in the line of gauge relation; for this line gives at each point the fall between ganges for that stage, or the summation of all acting resistances to flow through the reach. A fixed change in the line of gauge relation is thus a change in regimen, and while perhaps intinitely complex in its pool and bar and section phenomena, in this summation of fall it is closely determinate and its changes readily seen in the gauge relations.

The study of regimen by gauge relations consists in the search for some order or method in these changes. In this preliminary study of the Missouri River so far no method has been seen, and it may be that it is there hopelessly complicated by independent local changes. The subject is being pursued in Lower Mississipi data, where some order has been already found in regimen and its changes, which has been embodied in several special reports not yet published.

Very respectfully, your obedient servant,

J. A. SEDDON,
Assistant Engineer.

[blocks in formation]
« PreviousContinue »