Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

* Transmission unit cost (mills per kilowatt-hour) preliminary estimate.

[blocks in formation]

1 Energy for all plants in the system marketed as integrated supply of the Missouri River Basin project. Classification of energy on an individual plant or group basis is not available nor is operation contemplated on such a basis. The total generation for each plant has therefore been distributed on the basis of the ratio of each plant output to the total output of the system. No revenue dit been attributed to the transmission system.

2 Energy marketed as integrated supply of Missouri River Basin The capacity unit rate is included in the firm rate and is not b 4 Western division average rate. It is expected that at a future eastern division rate of the Missouri River Basin project.

Peaking capacity without energy, 70,000 kilowatts at $15 per k Peaking capacity without energy, 200,000 kilowatts at $15 per k 7 MRB integrated transmission system cost.

the same as the

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

! Includes Trinity River division as presentedțin H. Doc. 281, 84th Cong., 2d sess.

2 Delivered to Bonneville for marketing.

Transmission system not fully constructed.

Under full irrigation development.

Rate schedule not established.

The capacity unit rate is included in the firm rate and is not billed separately. Wheeling surcharge, $91,000; nonoperating income allocated to power operation, $17,000. Wheeling surcharge.

[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]
[blocks in formation]
[blocks in formation]

Colorado-Big Thompson_

Columbia Basin___

Advance engineering and design.

Construction, general__.

Drainage problems..

Farms, settlement on

General investigations.

Multiple-unit lessees..

Operation and maintenance.

Power, shortage of...

Rehabilitation and betterment.

Columbia lock and dam, Alabama and Georgia.

Columbia River at mouth_

Columbia River between Chinook and Sand Island..

Construction, general____.

Alaska, Hawaii, and Puerto Rico drainage area.

Arkansas White-Red River Basins..

Bids, characteristics of_

[blocks in formation]

Page

558

230

844, 887

2

495

319

273

1094

1060, 1211 1061

1063, 1081 1099

1060, 1069

1100

1099

1211

1230

1232

1228

679, 782

-798, 890

799

810

900, 903

898

798

901

864, 911

807

910

408, 415 810, 814

801

4

934, 1066

566

209

[blocks in formation]
« PreviousContinue »