Page images
PDF
EPUB
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]

1 Includes Trinity River division as presentedlin H. Doc. 281, 84th Cong., 2d sess.

Delivered to Bonneville for marketing.

Transmission system not fully constructed.

Under full irrigation development.

Rate schedule not established.

The capacity unit rate is included in the firm rate and is not billed separately.

7 Wheeling surcharge, $91,000; nonoperating income allocated to power operation, $17,000. Wheeling surcharge.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

Rehabilitation and betterment.

Repayment contracts..

Rvenue from nowerplants..

Chamita (Abiquiu) Reservoir

Channel improvement. Mississippi River and tributaries

10.4

[blocks in formation]

Status of____

Colorado-Big Thompson_

Columbia Basin___.

Advance engineering and design.

Construction, general-

Drainage problems.......

Farms, settlement on...

General investigations.

Multiple-unit lessees-

Operation and maintenance__

Power, shortage of---

Rehabilitation and betterment---

Columbia lock and dam, Alabama and Georgia_

Columbia River at mouth_.

Columbia River between Chinook and Sand Island_
Construction, general_.

Alaska, Hawaii, and Puerto Rico drainage area.

Arkansas White-Red River Basins

Bids, characteristics of__

[blocks in formation]
[blocks in formation]
[blocks in formation]

Frenchman-Cambridge division, Missouri River Basin project.

G

Garrison Reservoir..

Gavins Point Reservoir

General administrative expenses, Bureau of Reclamation.
General expenses, Corps of Engineers---.

General investigations:

75

583

1165

1213, 1216, 1224

26

448

648, 681, 752

755

706

652, 75 75

31140, 132

6, 8, 118

Alaska, Hawaii, and Puerto Rico drainage area 934, 1066, 1117, 11

Amount requested of Budget Bureau by Corps of Engineers.

[blocks in formation]
« PreviousContinue »