" The original project, as modified in 1883, provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water from the deep water above Red Bridge to the... "
Annual Reports of the War Department - Page 498
by United States. War Department - 1876
Full view - About this book

Cases Decided in the Court of Claims of the United States, Volume 103

United States. Court of Claims - 1946 - 906 pages
...and Harbors Act of 1940, as set forth in paragraph 2 above, plans were made and money allotted for the dredging of a channel 100 feet wide and 12 feet deep from deep water in Hampton Roads to a described locality adjoining the Nansemond Ordnance Depot. 4....
Full view - About this book

Report of the Chief of Engineers U.S. Army

United States. Army. Corps of Engineers - 1876 - 952 pages
...within 200 feet of the bar-buoy. By act of Congress approved March 3, 1875, an appropriation of $1,500 was made to continue the improvement of this harbor....forwarded to the Chief of Engineers June 26, 1875. (See Eeport for 1875, vol. 2, page S.) By letter from the Chief of Engineers dated July 20, 1875, the...
Full view - About this book

Annual Report of the Chief of Engineers to the Secretary of War ..., Volume 1

United States. War Department. Corps of Engineers - 1889 - 954 pages
...water. PLANS OF IMPROVEMENT. The original project, as modified in 1883, provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water from the deep water above Red Bridge to the ledge opposite Grant & Co.'s Wharf at Pawtucket;...
Full view - About this book

Annual Report of the Chief of Engineers, United States Army, Part 2

United States. Army. Corps of Engineers - 1891 - 660 pages
...21, 1890, a contract was entered into with Frank 0. Somers for the dredging required in the formation of a channel 100 feet wide and 12 feet deep at mean low water. This work was accomplished September 6, 1890, by the removal of 15,454 cubic yards of sand and...
Full view - About this book

Annual Report of the Chief of Engineers to the Secretary of War for ..., Part 1

United States. Army. Corps of Engineers - 1885 - 1130 pages
...completed in the years 18(>8-'76. The approved project of 18S3 provides for the excavation by dredging ot a channel 100 feet wide and 12 feet deep at mean low water from the deep water above lied Bridge to the ledge opposite Grant & Co.'s Wharf at Pawtucket...
Full view - About this book

Annual Report of the Chief of Engineers to the Secretary of War for ..., Issue 1

United States. Army. Corps of Engineers, United States. War Department. Corps of Engineers - 1891 - 1076 pages
...500 PLANS OP IMPROVEMENT. The, original project, as modified iii 1883, provides for the excav>ti« by dredging of a channel 100 feet wide and 12 feet deep at meanl«T water from the deep water above lied Bridge to the ledge oppos* Grant & Co.'s Wharf at Pawtucket;...
Full view - About this book

First- Forty-second Annual Report of the Board of Harbor Commissioners to ...

Rhode Island. Harbor Commissioners - 1877 - 742 pages
...water. PLANS OF IMPROVEMENT. The original project, as modified in 1883, provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water from the deep water above Red Bridge to the ledge opposite Grant & Co.'s Wharf at Pawtucket;...
Full view - About this book

At the General Assembly of the State of Rhode-Island and Providence ...

Rhode Island - 1885 - 1238 pages
...project was completed in the years 1868-'78. The approved project of 1883 provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water, from the deep water above Red Bridge to the ledge opposite Grant & Co.'s wharf, at Pawtucket;...
Full view - About this book

Report of the Chief of Engineers U.S. Army

United States. Army. Corps of Engineers - 1887 - 1090 pages
...water. PLANS OF IMPROVEMENT. The original project as modified in 1883 provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water, from the deep water above lied Bridge to the ledge opposite Grant & Go's wharf at Pawtucket;...
Full view - About this book

Annual Report of the Secretary of War

United States. War Department - 1887 - 972 pages
...far as the examination extended it had been entirely obliterated. Between May, 1879, and May, 1880, a channel 100 feet wide and 12 feet deep at mean low tide was cat by the Government from Bolivar Channel to Redfish Bar a distance of 9£ miles, the average...
Full view - About this book