Annual Reports of the War Department, Part 1U.S. Government Printing Office, 1876 |
From inside the book
Results 1-5 of 100
Page 8
... portion of the main work were completed and the parade graded . No appropriation was made for the fiscal year ending June 30 , 1877 . Appropriation asked for next fiscal year $ 50,000 Battery on Portland Head , Portland Harbor , Maine ...
... portion of the main work were completed and the parade graded . No appropriation was made for the fiscal year ending June 30 , 1877 . Appropriation asked for next fiscal year $ 50,000 Battery on Portland Head , Portland Harbor , Maine ...
Page 15
... portion of the the parade piers along the channel front , in repairing and preserving the slopes , and straightening the sewer leading from new latrine to the river at its point of junction with the old latrine . The expenditures not ...
... portion of the the parade piers along the channel front , in repairing and preserving the slopes , and straightening the sewer leading from new latrine to the river at its point of junction with the old latrine . The expenditures not ...
Page 16
... portion of the slopes , and cut- ting grass . This battery is ready for four guns , in addition to those already mounted . No separate appropriation is asked for the next fiscal year . South Cliff Battery , Staten Island , New York ...
... portion of the slopes , and cut- ting grass . This battery is ready for four guns , in addition to those already mounted . No separate appropriation is asked for the next fiscal year . South Cliff Battery , Staten Island , New York ...
Page 20
... portion . Total length of crib - work , 125 feet . A portion of the head of the wharf , 12 feet in length , has been cut down to facilitate landing from boats . Attention is again urgently invited to the fact that the unfinished ...
... portion . Total length of crib - work , 125 feet . A portion of the head of the wharf , 12 feet in length , has been cut down to facilitate landing from boats . Attention is again urgently invited to the fact that the unfinished ...
Page 24
... portion of cover - face and other parts as to necessitate the expenditure of re- maining funds in reconstructions ... portions of wall below water were laid in bags , without being previously wet , each layer being well rammed . This ...
... portion of cover - face and other parts as to necessitate the expenditure of re- maining funds in reconstructions ... portions of wall below water were laid in bags , without being previously wet , each layer being well rammed . This ...
Other editions - View all
Common terms and phrases
00 Amount act approved August Amount appropriated Amount available July Amount estimated appropriated by act approved August 14 bank beach boats bowlders breakwater bridge built canal Cape Fear River cents channel Chief of Engineers chord commenced completion of existing Congress construction continued contract Core Sound Corps of Engineers Creek cubic yards dike distance dredging ending June 30 excavation existing project expended during fiscal expended in fiscal feet at mean feet deep feet wide fiscal year ending gabions gauge harbor high-water improvement inches Inlet Island jetty June 23 Lake ledge length Lieut locks low water lower Major Merrill mean low-water miles Mississippi River Money statement mouth navigation obstructions pier portion profitably expended reef removed repairs required for completion riprap rock Saint Saint Mary's River sand shoal shore Sound Steamer stone survey thousand dollars tide timber tion Total upper vessels Warwick Bar width
Popular passages
Page 29 - No appropriation asked for next fiscal year. Batteries on Angel Island, San Francisco Harbor, California, in charge of Lieut. Col. CS Stewart, Corps of Engineers. — These three temporary earthworks, constructed during the late war, are essentially unserviceable. The platforms are decayed, and most of the carriages have been condemned.
Page 147 - ... and no bridge shall be commenced or built under this act until the location thereof and the plans and specifications for its construction shall have been submitted to and approved by the iSecretary of War; and any change...
Page 147 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river...
Page 23 - Pulaski, mouth of Savannah River, Georgia, in charge of Lieut. Col. QA Gillmore, Corps of Engineers. — This is the principal work for the defense of Savannah on the outer line of the system.
Page 16 - Corps of Engineers. — One of the great objects of this work is to prevent the occupation of the lower bay as an anchorage by an enemy's fleets.
Page 43 - Sea-wall on Point Allerton. — This wall was completed in May, 1874, together with a riprap apron-work for the protection of its foundation. Its total length is 1,202 feet. It is now in excellent condition in every respect, and fully answers the purpose intended.
Page 498 - The original project, as modified in 1883, provides for the excavation by dredging of a channel 100 feet wide and 12 feet deep at mean low water from the deep water above Red Bridge to the...
Page 143 - Proviso, locks, the Secretary of War shall take possession of and use the said lands, after having purchased the same, or, in case the said lands cannot be purchased for a reasonable price, then after having paid for the same, or secured the value thereof, which value may be ascertained in the mode provided by the laws of Oregon for the condemnation of lauds for public uses in that State.
Page 131 - ... approaches thereto, under and upon such terms and conditions as shall be prescribed by the Secretary of War, upon hearing the allegations and proofs of the parties, in case they shall not agree.
Page 437 - During the last week of May and the first week of June...