Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 50
Page 114
... STRUCTURAL STEEL ERECTION SPECIFICATIONS SCOPE OF WORK : The party performing the work under this heading , hereinafter ... structure until finally completed . Structural steel erector shall provide plank and cover all floors required by ...
... STRUCTURAL STEEL ERECTION SPECIFICATIONS SCOPE OF WORK : The party performing the work under this heading , hereinafter ... structure until finally completed . Structural steel erector shall provide plank and cover all floors required by ...
Page 115
... structure , as detailed by the fabricator or as otherwise indicated on the drawings . FIELD PAINTING : All structural steel , unless otherwise specified , shall be given one field coat of Detroit Graphic ( black ) No. 30 or other paint ...
... structure , as detailed by the fabricator or as otherwise indicated on the drawings . FIELD PAINTING : All structural steel , unless otherwise specified , shall be given one field coat of Detroit Graphic ( black ) No. 30 or other paint ...
Page 231
... structure to which the scaffold is at- tached , independently of the scaffolding , and shall have a safety factor of at least 3 . Temporary Footways . Whenever a tempo- rary fence or enclosure is within 4 ft of the curb line , a ...
... structure to which the scaffold is at- tached , independently of the scaffolding , and shall have a safety factor of at least 3 . Temporary Footways . Whenever a tempo- rary fence or enclosure is within 4 ft of the curb line , a ...
Contents
Construction Scheduling | 1 |
Purchasing | 53 |
Materials Expediting and Transportation | 143 |
Copyright | |
6 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches