Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 37
Page 17
... secured , the actual delivery dates are established for scheduling . If the items need to be purchased , a tentative delivery date may be set by the purchasing department before the actual pur- chase is made or dates secured from past ...
... secured , the actual delivery dates are established for scheduling . If the items need to be purchased , a tentative delivery date may be set by the purchasing department before the actual pur- chase is made or dates secured from past ...
Page 150
... secured from the requi- sition or purchase order , which , in turn , has been secured from the B / M and the applicable drawing . There generally is more than one pur- chase for an activity ; below this it is indicated in the space ...
... secured from the requi- sition or purchase order , which , in turn , has been secured from the B / M and the applicable drawing . There generally is more than one pur- chase for an activity ; below this it is indicated in the space ...
Page 151
... secured from other sources . If material is to be secured from stores stock , confirmation of its existence should be made . The same is true for materials to be secured from salvage . At the same time a check can be maintained on the ...
... secured from other sources . If material is to be secured from stores stock , confirmation of its existence should be made . The same is true for materials to be secured from salvage . At the same time a check can be maintained on the ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches