Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 75
Page 10
... recording and issuing drawing numbers and not to record their movement . Drawing Progress Record . Once an engi- neer / draftsman has been allocated a block number for a drawing to be made , the move- ment and progress of the work on ...
... recording and issuing drawing numbers and not to record their movement . Drawing Progress Record . Once an engi- neer / draftsman has been allocated a block number for a drawing to be made , the move- ment and progress of the work on ...
Page 11
George E. Deatherage. DRAWING & BILL OF MATERIAL RECORD SCHEDULED RECEIVED PREL CHKD PREL CHKD FIG . 1.8 . Drawing and bill of material record . RECORD OF DRAWINGS NUMBER = ACTIVITY NO .. CP ? NETWORK NO .. SUB - NETWORK . W.O .. ITEM ...
George E. Deatherage. DRAWING & BILL OF MATERIAL RECORD SCHEDULED RECEIVED PREL CHKD PREL CHKD FIG . 1.8 . Drawing and bill of material record . RECORD OF DRAWINGS NUMBER = ACTIVITY NO .. CP ? NETWORK NO .. SUB - NETWORK . W.O .. ITEM ...
Page 160
... record clerk , or demurrage clerk , whoever keeps the record sheet , must have his postings backed up by the written record , a record which is con- tinuous from the time the B / L is received and the car actually placed , unloaded ...
... record clerk , or demurrage clerk , whoever keeps the record sheet , must have his postings backed up by the written record , a record which is con- tinuous from the time the B / L is received and the car actually placed , unloaded ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches