Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 78
Page 9
... drawings and specifica- tions . A drawing change starts a whole series of scheduling changes in materials deliveries and job progress . This means that the entire engineering and drafting - room procedure must interlock with the ...
... drawings and specifica- tions . A drawing change starts a whole series of scheduling changes in materials deliveries and job progress . This means that the entire engineering and drafting - room procedure must interlock with the ...
Page 13
... drawings . The issuance of drawings usually requires information to be imparted that cannot be carried on the drawing itself . Some firms ac- company the drawings with a letter stating the purpose for which the drawings were sent and ...
... drawings . The issuance of drawings usually requires information to be imparted that cannot be carried on the drawing itself . Some firms ac- company the drawings with a letter stating the purpose for which the drawings were sent and ...
Page 128
... drawings and specifications . The right is reserved by the contractor to accept or reject all proposals or any part thereof . Work Included . The work of the subcon- tractor as hereinafter referred to shall include , unless otherwise ...
... drawings and specifications . The right is reserved by the contractor to accept or reject all proposals or any part thereof . Work Included . The work of the subcon- tractor as hereinafter referred to shall include , unless otherwise ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches