Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 50
Page 38
... determined for all of the remaining 18 operations until it is found that the earliest possible starting date for operation 18 is 61 days . To determine the earliest possible finishing date for each individual operation , in each indi ...
... determined for all of the remaining 18 operations until it is found that the earliest possible starting date for operation 18 is 61 days . To determine the earliest possible finishing date for each individual operation , in each indi ...
Page 48
... determined and not on unprovable assumptions . Tradition is con- stantly being outmoded . In the past it was taken for granted that the roof was the last thing to be put on the building structure . Today , with the lift - slab technique ...
... determined and not on unprovable assumptions . Tradition is con- stantly being outmoded . In the past it was taken for granted that the roof was the last thing to be put on the building structure . Today , with the lift - slab technique ...
Page 50
... determination of the fastest and / or most eco- nomical combination of men and machines to perform work . Here , all the ... determined , such as the daily ownership oper- ating costs for each of the machines involved , their production ...
... determination of the fastest and / or most eco- nomical combination of men and machines to perform work . Here , all the ... determined , such as the daily ownership oper- ating costs for each of the machines involved , their production ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches