Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 70
Page 79
... covered with backfill . Lower grades may also be warranted when surfaces are to be painted or covered with some other material . High - compressive- strength concrete may be specified in places where it is entirely unnecessary and a ...
... covered with backfill . Lower grades may also be warranted when surfaces are to be painted or covered with some other material . High - compressive- strength concrete may be specified in places where it is entirely unnecessary and a ...
Page 111
... covered in the AIA General Conditions of the Contract or any of the general conditions of the specifications or any special conditions not covered in any of the above , such as may develop from pro- posals or which are not brought out ...
... covered in the AIA General Conditions of the Contract or any of the general conditions of the specifications or any special conditions not covered in any of the above , such as may develop from pro- posals or which are not brought out ...
Page 231
... Covered Sidewalks . These , where possible , shall be constructed before any operation is commenced and be of sufficient strength to protect the public during construction from falling materials . Such coverings shall remain in place ...
... Covered Sidewalks . These , where possible , shall be constructed before any operation is commenced and be of sufficient strength to protect the public during construction from falling materials . Such coverings shall remain in place ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches