Page images
PDF
EPUB
[merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small]

§ 616cccc. Transfer of operation to water users' organization.

The Secretary is authorized to transfer to a water users' organization the care, operation, and maintenance of the project works, and, if such transfer is made to credit annually against the organization's repayment obligation that portion of the year's operation and maintenance costs which, if the United States had continued to operate the project, would have been allocated to flood control, fish and wildlife, and recreation purposes. Prior to assuming care, operation, and maintenance of the project works the water users' organization shall obligate itself to operate them in accordance with regulations prescribed by the Secretary of the Army with respect to flood control, and by the Secretary of the Interior with respect to fish and wildlife and recreation. Upon complete payment of the obligation assumed, the water users' organization, its designee or designees, shall

Sec.

be conveyed title to such portions of the aqueducts and related facilities as are used solely for delivering project water to water users, and shall have a permanent right to use that portion of project reservoir capacity which is or may be allocated to municipal and industrial water supply purposes by the Secretary of the Interior, so long as the space designated for those purposes may be physically available. taking into account such equitable reallocation of reservoir storage capacities among the purposes to be served by the project as may be necessary due to sedimentation, subject, if the project is then operated by the United States, to payment to the United States of a reasonable annual charge to cover operation and maintenance costs and a fair share of administrative costs applicable to the project. (Pub. L. 90-503, § 3, Sept. 21, 1968, 82 Stat. 854.)

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in section 616bbbb of this title.

[blocks in formation]

16. Colorado River Basin Project 43 U.S.C. 1501, 1527, 1528

SUBCHAPTER I.-OBJECTIVES

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities: improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes.

(b) It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the "Secretary") shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this Act and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether hereto

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

REFERENCES IN TEXT

The Federal Water Project Recreation Act, referred to in text, is Pub. L. 89-72, July 9, 1965. 79 Stat. 213. which is classified to sections 4601-5(a), 4601-12 to 4601-21, and 662(d) of Title 16, Conservation.

§ 1528. Authorization of appropriations.

(a) There is hereby authorized to be appropriated for construction of the Central Arizona Project, including prepayment for power generation and transmission faclities but exclusive of distribution and drainage facilities for non-Indian lands. $832,180,000 plus or minus such amounts, if any, as may be justifed by reason of ordinary fluctuations in construction costs as indicated by engineering cost indices applicable to the types of construction involved therein and, in addition thereto, such sums as may be required for operation and maintenance of the project.

(b) There is also authorized to be appropriated $100,000.000 for construction of distribution and drainage facilities for non-Indian lands. Notwithstanding the provisions of section 1543 of this title, neither appropriations made pursuant to the authorization contained in this subsection nor revenues collected in connection with the operation of such facilities shall be credited to the Lower Colorado River Basin Development Fund and payments shall not be made from that fund to the general fund of the Treasury to return any part of the costs of construction, operation, and maintenance of such facilities. (Pub. L. 90-537, title III, § 309, Sept. 30. 1968, 82 Stat. 893.)

17. Palmetto Bend Project, Texas 43 U.S.C. 616

§ 616gggg. Authorization for construction, operation, and maintenance.

The Secretary of the Interior is authorized to construct, operate, and maintain the first stage and to acquire lands for the second stage of the Palmetto Bend Federal reclamation project, Texas, in accordance with the Federal reclamation laws (Act of June 17. 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto) for the purposes of storing, regulating, and furnishing water for municipal and industrial use, conserving and developing fish and wildlife resources, and enhancing outdoor recreation opportunities. The stage 1 development of the project shall consist of the following principal works: Palmetto Bend Dam and Reservoir on the Navidad River near Edna, Texas, and recreation facilities. (Pub. L. 90-562, § 1, Oct. 12, 1968. 82 Stat. 999.)

[blocks in formation]

§ 616iiii. Transfer of project care and operation to contractor; permanent usage rights.

(a) The Secretary is authorized to transfer to a qualified contracting entity or entities the care, operation, and maintenance of the project works, and, if such transfer is made, to credit annually against the contractor's repayment obligation that portion of the year's joint operation and maintenance costs which, if the United States had continued to operate the project, would have been allocated to fish and wildlife and recreation purposes. Prior to assuming care, operation, and maintenance of the project works the contracting entity or entities shall be obligated to operate them in accordance with criteria established by the Secretary of the Interior with respect to fish and wildlife and recreation.

(b) Upon complete payment of the obligation assumed, the contracting entity or entities, their designee or designees, shall have a permanent right to use that portion of project reservoir capacity which is or may be allocated to municipal and industrial water supply purposes by the Secretary of the Interior, so long as the space designated for those purposes may be physically available, taking into account such equitable reallocation of reservoir storage capacities among the purposes served by the project as may be necessary due to sedimentation,

subject, if the project is then operated by the United States, to payment to the United States of a reasonable annual charge to cover operation and maintenance costs and a fair share of administrative costs applicable to the project.

(c) Expenditures for the Palmetto Bend project may be made without regard to the soil survey and land classification requirements of section 390a of this title. (Pub. L. 90-652, § 3, Oct. 12, 1968, 82 Stat. 999.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in section 616hhhh of this title.

§ 616jjjj. Conservation; development of fish and wildlife resources; recreation.

The conservation and development of the fish and

wildlife resources and the enhancement of recreation opportunities in connection with the Palmetto Bend project shall be in accordance with the Federal Water Project Recreation Act. (Pub. L. 90-562, § 4, Oct. 12, 1968, 82 Stat. 1000.)

REFERENCES IN TEXT

The Federal Water Project Recreation Act, referred to in text, is Pub. L. 89-72, July 9, 1965, 79 Stat. 213, which is classified to section 4601-12 et seq. of Title 16. Conservation.

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in section 616hhhh of this title.

18. Merlin Division, Rogue River Basin Project, Oregon

43 U.S.C. 616

§ 616mmmm. Authorization for construction, operation, and maintenance; purpose; principal works. For the purposes of providing irrigation water for approximately nine thousand three hundred acres, flood control, area redevelopment, and providing municipal and industrial water supply, fish and wildlife enhancement, and recreation benefits, the Secretary of the Interior, acting pursuant to the Federal reclamation laws (Act of June 17, 1902 (32 Stat. 388), and Act amendatory thereof or supplementary thereto, is authorized to construct, operate, and maintain the Merlin division, Rogue River Basin project, Oregon. The principal works of the division shall consist of Sexton Dam and Reservoir, diversion and distribution facilities, and drainage facilities. (Pub. L. 91-270, § 1, May 28, 1970, 84 Stat. 273.)

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

REFERENCES IN TEXT

The Federal Water Project Recreation Act referred to in the text, is classified to section 4601-12 et seq. of Title 16, Conservation.

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in sections 616rrrr, 616ssss of this title.

§616pppp. Authority to transfer and repossess works; compliance with regulations.

Before the works are transferred to an irrigation water user's organization for care, operation, and maintenance, the organization shall have agreed to operate them in such fashion, satisfactory to the Secretary, as to achieve the benefits to fish and wildlife enhancement, and recreation on which the allocations of costs therefor are predicated, and to operate them in accordance with regulations prescribed by the Secretary of the Army to achieve the benefits to flood control on which the allocation of casts1 therefor is predicated, and to return the works to the United States for care, operation, and maintenance in the event of failure to comply with the requirements to achieve such benefits. (Pub. L. 91270, § 4, May 28, 1970, 84 Stat. 273.)

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in sections 616rrrr, 616ssss of this title.

§ 616qqqq. Power for irrigation water pumping. Power and energy required for irrigation water pumping for the Merlin division shall be made available by the Secretary from the Federal Columbia River system at charges determined by him. (Pub. L. 91-270, § 5, May 28, 1970, 84 Stat. 273.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 616rrrr, 616ssss of this title.

19. Touchet Division, Walla Walla Project, Oregon-Washington

43 U.S.C. 616

$616tttt. Authorization for construction, operation, and maintenance.

(a) Purposes; principal works.

For purposes of supplying irrigation water initially for approximately ten thousand acres of land, providing municipal and industrial water, flood control, the enhancement of fish and wildlife resources, and the enhancement of recreation opportunities, the Secretary of the Interior (hereinafter referred to as the Secretary) is authorized to construct, operate, and maintain the Touchet division of the Walla Walla project, Oregon-Washington, in accordance with the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto). The principal works of the division (hereinafter referred to as the project) shall consist of the Dayton Dam and Reservoir, fish passage facilities, a diversion dam, and associated drainage facilities.

[blocks in formation]

(c) Maintenance of streamflow to insure fish and wildlife conservation.

In order to assure a realization of the fish and wildlife enhancement benefits contemplated by sections 616tttt to 616yyyy of this title, the Secretary shall adopt appropriate measures to insure the maintenance of a streamflow between Dayton Dam and the mouth of the Walla Walla River that is not less than thirty cubic feet per second unless he determines that a water shortage or other emergencies exist or that lesser flows would be adequate for the maintenance of fish life. (Pub. L. 91-307, § 1, July 7, 1970, 84 Stat. 409.)

[merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]
[merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]

(a) Separable and joint construction costs allocable to enhancement of anadromous fish.

There are authorized to be appropriated to the United States Fish and Wildlife Service, for transfer to the Bureau of Reclamation, such sums as may be required to cover separable and joint construction costs of the Touchet division, Walla Walla project, allocable to the enhancement of anadromous fish as determined by cost allocation studies comparable to those set forth in House Document Numbered 155, Eighty-ninth Congress, second session.

(b) Construction of works involved in Touchet division.

There are authorized to be appropriated to the Bureau of Reclamation for construction of the works involved in the Touchet division $22,774,000 (January 1969 prices), less the amounts authorized by subsection (a) of this section.

(c) Adjustment of appropriated amounts.

The total sums authorized to be appropriated by subsection (a) and subsection (b) of this section shall be plus or minus such amounts, if any, as may be required by reason of changes in the cost of construction work of the types involved therein as shown by engineering cost indexes, and, in addition thereto, such sums as may be required to operate and maintain such division: Provided, That funds appropriated pursuant to the authority contained in subsection (b) of this section shall be expended only if the amount thereof is increased in any given fiscal year by a proportionate amount appropriated pursuant to subsection (a) of this section. (Pub. L. 91-307, § 6, July 7, 1970, 84 Stat. 410.)

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in sections 616tttt, 616xxxx of this title.

20. Garrison Diversion Unit, Missouri River Basin Project, North Dakota

South Dakota

Act of August 5, 1965, P.L. 89-108 (79 Stat. 433-435)

AN ACT

To make certain provisions in connection with the construction of the Garrison diversion unit, Missouri River Basin project, by the Secretary of the Interior.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That the general plan for the Missouri-Souris unit of the Missouri River Basin

project, heretofore authorized in section 9 of the Flood Control Act of December 22, 1944 (58 Stat. 887), as modified by the report of the Secretary of the Interior contained in House Document Numbered 325, Eighty-sixth Congress, second session, is confirmed and approved under the designation "Garrison diversion unit," and the construction of a development providing for the irrigation of two hundred and fifty thousand acres, municipal and industrial water, fish and wildlife conservation and development, recreation, flood control, and other project purposes shall be prosecuted by the Department of the Interior substantially in accordance with the plans set out in the Bureau of Reclamation report dated November 1962 (revised February 1965) supplemental report to said House Document Numbered 325.

SEC. 2. (a) Subject to the provisions of subsections (b), (c), (d), and (e) of this section, the Secretary is authorized in connection with the Garrison diversion unit (i) to construct, operate, and maintain or provide for the construction, operation, and maintenance of public outdoor recreation and fish and wildlife enhancement facilities, (ii) to acquire or otherwise to include within the unit area such adjacent lands or interests in land as are necessary for present or future public recreation or fish and wildlife use, (iii) to allocate water and reservoir capacity to recreation and fish and wildlife enhancement, and (iv) to provide for the public use and enjoyment of unit lands, facilities, and water areas in a manner coordinated with other unit purposes. The Secretary is further authorized to enter into agreements with Federal agencies or State or local public bodies for the operation, maintenance, and replacement of unit facilities, and to transfer unit lands or facilities to Federal agencies or State or local public bodies by lease or exchange, upon such terms and conditions as will best promote the development and operation of such lands or facilities in the public interest for recreation and fish and wildlife enhancement purposes.

(b) All costs allocated to fish and wildlife enhancement and incurred in connection with waterfowl refuges and waterfowl production areas proposed for Federal administration shall be nonreimbursable.

(c) (1) If, before commencement of construction of the unit, non-Federal public bodies agree to administer for recreation or fish and wildlife enhancement or for both of these purposes pursuant to the plan for the development of the unit approved by the Secretary, land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the separable costs of the unit allocated to either or both of said purposes, as the case may be, and attributable to such areas and all the costs of operation, maintenance, and replacement incurred in connection therewith, the remainder of the separable capital costs so allocated and attributed shall be nonreimbursable.

(2) In the absence of such a preconstruction agreement, recreation and fish and wildlife enhancement facilities (other than minimum facilities for the public health and safety at reservoir access points and facilities related to Federal waterfowl refuges and waterfowl production areas) shall not be provided, and the allocation of unit costs shall reflect only the number of visitor days

and the value per visitor day estimated to result from such diminished recreation development without reference to lands which may be provided pursuant to subsection (e) of this section.

(d) The non-Federal share of the separable capital costs of the unit allocated to recreation and fish and wildlife enhancement shall be borne by non-Federal interests, under either or both of the following methods as may be determined appropriate by the Secretary: (i) payment, or provision of lands, interests therein, or facilities for the unit; or (ii) repayment, with interest, within fifty years of first use of unit recreation or fish and wildlife enhancement facilities: Provided, That the source of repayment may be limited to entrance and user fees or charges collected at the unit by non-Federal interests if the fee schedule and the portion of fees dedicated to repayment are established on a basis calculated to achieve repayment as aforesaid and are made subject to review and renegotiation at intervals of not more than five

years.

(e) Nothwithstanding the absence of preconstruction agreements as specified in subsection (c) of this section lands may be acquired in connection with construction of the unit to preserve the recreation and fish and wildlife enhancement potential of the unit.

(1) If non-Federal public bodies agree within ten years after initial unit operation to administer for recreation and fish and wildlife enhancement pursuant to the plan for development of the unit approved by the Secretary land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the costs of lands acquired therefor pursuant to this subsection and facilities and project modifications provided for those purposes and all costs of operation, maintenance, and replacement incurred therefor, the remainder of the costs of such lands, facilities, and project modifications shall be nonreimbursable. Such agreement and subsequent development shall not be the basis for any allocation of joint costs of the unit to recreation or fish and wildlife enhancement.

(2) If, within ten years after initial operation of the unit, there is not an executed agreement as specified in paragraph (1) of this subsection, the Secretary may utilize the lands for any lawful purpose within the jurisdiction of the Department of the Interior, or may transfer custody of the land to another Federal agency for use for any lawful purpose within the jurisdiction of that agency, or may lease the lands to a non-Federal public body. or may transfer the lands to the Administrator of General Services for disposition in accordance with the surplus property laws of the United States. In no case shall the lands be used or made available for use for any purpose in conflict with the purposes for which the project was constructed, and in every case preference shall be given to uses which will preserve and promote the recreation and fish and wildlife enhancement potential of the project or, in the absence thereof, will not detract from that potential.

(f) Subject to the limitations hereinbefore stated, joint capital costs allocated to recreation and fish and wildlife enhancement shall be nonreimbursable.

(g) Costs of means and measures to prevent loss

« PreviousContinue »