Contract Documents... |
From inside the book
Results 1-3 of 14
Page 42
... Portland Cement . Portland Cement shall meet the requirements of the Standard Specifi- cations for Portland Cement of the A. S. T. M. ( Serial Designation : C9-21 ) with the additional requirements as follows : The average tensile ...
... Portland Cement . Portland Cement shall meet the requirements of the Standard Specifi- cations for Portland Cement of the A. S. T. M. ( Serial Designation : C9-21 ) with the additional requirements as follows : The average tensile ...
Page 47
... Portland cement and sand shall be of the qual- ity specified under concrete . 42. Laying Brick . All brickwork shall be thoroughly cleaned and wetted before joining new work thereto . The brickwork shall be well bonded and bats shall ...
... Portland cement and sand shall be of the qual- ity specified under concrete . 42. Laying Brick . All brickwork shall be thoroughly cleaned and wetted before joining new work thereto . The brickwork shall be well bonded and bats shall ...
Page 37
... Portland Cement Portland cement shall meet the requirements of the Specifications and Tests for Portland Cement of the American Society for Testing Ma- terials , bearing Serial Designation C9-26 . No brand of cement shall be used which ...
... Portland Cement Portland cement shall meet the requirements of the Specifications and Tests for Portland Cement of the American Society for Testing Ma- terials , bearing Serial Designation C9-26 . No brand of cement shall be used which ...
Contents
INDEX TO THE ARTICLES | 116 |
Execution Correlation and Intent of Documents | 2 |
Drawings and Specifications | 3 |
53 other sections not shown
Other editions - View all
Common terms and phrases
approved arbitration Article Asst bars Beam bidder Board of Water brick cast iron cement certified check City of Detroit complete concrete construction Contract Documents Contractor shall furnish Control Chamber cost damages DEPARTMENT OF WATER DETAIL Detroit Bar Association DETROIT DEPARTMENT diameter discharge Division of Engineering Drawings electric electric motor Elev Elex Engineer Chief Engineer Engineer CITY Engineer's equipment excavation execution feet FILTERED WATER RESERVOIR final payment gate valve inches joints liquidated damages Low Lift Plant M.G.D. UNIT Manhole material motor necessary operating pile pipe PLAN plate Portland Cement proposal pumping unit Reinforcement removed roof slab SECTION sewer shaft shown sixty 60 Specifications Springwells Station STATION FILTERED WATER steel structural steel structures Sump Sump Pump SUPPLY WATERWORKS PARK Surety surety bonds surface surge tank thereof total head vertical Water Commissioners WATER SUPPLY WATERWORKS Water Works Park WATERWORKS PARK STATION Weir Chamber written notice