TABULAR STATEMENT Of Pipe Laid for the Distribution and Supply of the City of New-York with Croton Water to Jan. 1, 1849. The figures at the head of the columns indicate the internal diameter of the pipe; those in the columns the number of feet laid. N. S., North Side; S. S., South Side; E. S., East Side; W. S., West Side; C., Center;=, Double Line of Pipe. |