nishing all other materials and all the work. Work during the present season was commenced May 31, and has been confined to driving piles. It was found necessary to employ a dredge for about six days to remove the debris of stone and sand which had fallen into the channel on the south side, in order to properly drive the piles.

The following is a detailed statement of cost of materials and work for the fiscal year:

1,398 linear feet white-oak piles, at 13 cents per foot...
4,300 linear feet white-oak piles, at 13 cents per foot...
10,122 cubic feet pine timber, at 143 cents per foot
336 feet, board measure, oak timber, at $20 per M.
508 feet, board measure, pine timber, at $12 per M.
435 cords of stone, at $9 90 per cord
232 cords of slabs, at $3 50 per cord

128

128

[ocr errors]

8,375 pounds of drift-bolts, at 33 cents per pound

$188 73

559 00

1, 492 99

6 72

6 10

4,314 02

814 62

314 06

1,053 pounds of drift-bolts, at 3.65 cents per pound. Tools and sundries ....

38 43

120 32

Wood for engine of pile-driver

14 37

Superintendence

722 99

Driving piles, 2,461 feet, at 22 cents per foot.

541.42

Advertising

44 84

Use of tug and scow

Transportation of iron bolts.

Labor....

232 95

9 38

2,009 75

877 50

Dredging 584 hours, at $15 per hour.

Total

Amount on hand July 1, 1870....
Appropriation approved July 11, 1870
Appropriation approved March 3, 1871...

Total ....

Less amount expended during fiscal year..

Amount remaining on hand July 1, 1871

12,308 19

$494 47

10, 000 00

10, 000 00

20, 494 47

12, 308 19

8, 186 28

Before the close of navigation the superstructure on the north pierhead, and about 640 feet of channel revetment, will be completed, which will entirely exhaust the amount available for expenditure at this harbor.

The revetment to the channel-way should be finished as soon as practicable. This work is shown in red on the accompanying tracing. To do this 850 feet of close piling in addition to what is now under course of construction will be required, which will cost $12,500. Unless this work is done great damage may result. Black Lake Harbor is in the district of Michigan. There has been a pier light erected there during the past year.

Abstract of bids opened and received August 27, 1870, for improving harbor at Black Lake,

Michigan.

[blocks in formation]

Abstract of contracts awarded for improving harbor at Black Lake, Michigan.

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

Abstract of proposals received and opened May 4, 1871, for furnishing the requisite materia and doing the work of improving the harbor at Black Lake, Michigan.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

Abstract of contracts awarded for improvement of harbor at Black Lake, Michigan.

[blocks in formation]

Statement of ressels entered and cleared at Black Lake Harbor, (Holland, Michigan,) in the district of Michigan, showing the number, tonnage, crews, and cargoes during the year.

[blocks in formation]

REPORT OF THE WORK FOR IMPROVING THE HARBOR AT SAUGATUCK, MICHIGAN.

The revetment on left bank of Kalamazoo River has been completed as far as the east end of slab-pier. The work is substantial and has already proved of signal service in deepening the channel. (On accompanying tracing the black figures give depth of water before building of revetment and red figures the depth found on opening of navigation.) The detailed cost of the work was as follows:

20,429 linear feet white-oak piles, at 13 cents.. 610 linear feet beech piles, at 10 cents..

64,704 feet, board measure, pine timber, at $11 50 per M..

15,5573 linear feet hemlock piles, at, 8 cents.

1,920 feet, board measure, pine timber, at $10 per M

12,0714 feet, board measure, oak timber, at $16 per M.

[blocks in formation]

12 cords of facines, at $2 10 per cord....

8,432 pounds of drift-bolts, at 34 cents per pound. Driving 1,770 piles, at $2 per pile...

$2,655 89 61 10 1,244 62 744 09 19 20 193 14

4,832 08 4,904 92 25 20 274 04 3,540 00

Framing 15,028 feet of timber, at 13 cents per foot.

Freight, dockage, and storage of drift-bolts...

Tug-hire

Advertising

Labor....

Superintendence

Total.....

Amount on hand July 1, 1870....

Allotted during fiscal year from appropriation for repairs

preservation, &c....

1,953 64

23 25

155 00

64 00

12 81 1,997 44

$22,700 42

$16, 774 43

662 31

[blocks in formation]

After due advertisement and opening of proposals, May 4, 1871, contracts were awarded to Parkhurst & Wilkinson for iron, and to F. L. Tebel for all the remaining materials and all the work of protecting the slab-pier on south side of entrance to the river. The work is now under construction and it is hoped that it will be finished by November 1, 1871. The blue lines on accompanying tracing show the rows of protecting piles. The recommendation made in my last report for a north pier and necessary revetment at mouth of river is renewed. This work will cost $59,300 98, and this amount can be profitably expended during the fiscal year ending June 30, 1873.

Saugatuck is in the district of Michigan. There is a light-house, with lantern of sixth order, on the north side of the harbor.

Abstract of proposals received and opened May 4, 1871, for furnishing the requisite materials and doing the work for improving the harbor at Saugatuck, Michigan.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Abstract of contracts awarded for improvement of harbor at Saugatuck, Michigan.

[blocks in formation]

Statement of vessels entered and cleared at Saugatuck Harbor, in the district of Michigan, showing the number of vessels, tonnage, crews, and cargoes, during the year 1870.

[blocks in formation]

REPORT OF OPERATIONS AT THE HARBOR AT SOUTH HAVEN, MICHIGAN.

After due advertising and opening of proposals September 4, 1870, contracts were awarded to George Hannahs for furnishing timber, and to G. P. Adams & Brother for furnishing stone.

By hired labor there was built a 30-foot square crib, which was placed on the extension of the north pier. The north pier, which had settled very irregularly, was also leveled up. This work was done during the months of September, October, and November of 1870.

After due advertising and opening of proposals, contracts were, May 15, 1871, awarded to Messrs. Peirce & Whaling for iron, and to George Hannahs for the remaining materials and all the work. Under this contract, one crib 50 feet by 32 feet was placed on the extension of the south pier during the last fiscal year. The detailed cost of the work was as follows:

62,128 feet, board measure pine timber, at $14 50 per M.... 5,128 cubic feet hemlock timber, at 293 cents per foot..

280,2 cords of stone, at $10 23..

128

104 cords of stone, at $11.

26 cords of stone, at $11 25.

7.4584 pounds of drift-bolts, at 33 cents per pound. 1,122 pounds of screw-bolts, at 5 cents per pound. 100

55224 pounds of washers, at 43 cents per pound.

100

390 pounds of rope, at 15 cents per pound...

Use of tug and scow...

Tools, iron, &c........

...

Advertising
Labor....
Superintendence
Transportation..

$900 86

1,512 76

2,866 07

1, 149 75

292 50

279 71

56 24

26 23

59 80

104 00

57 47

121 00

617 32

667 41

1 00

8, 712 12

« PreviousContinue »