Page images
PDF
EPUB

APPENDIX II-Treatment Standards (AS CONCENTRATIONS IN THE TREATMENT RESIDUAL

EXTRACT)

[Note: The technologies shown are the basis of the treatment standards. They are not required to be used in meeting the treatment standards]

[blocks in formation]

In some instances other technologies achieved somewhat lower treatment values but waste characterization data were insufficient to identify separate treatability groups. Refer to the BDAT background document for a detailed explanation of the determination of the treatment standards.

[blocks in formation]

2 Wastewaters generated by pharmaceutical plants must be treated to the standards given for all other wastewaters except in the case of methylene chloride.

3 The treatment standards in this treatability group are based on incineration.

[blocks in formation]
[blocks in formation]

Organochlorine Pesticides

Aldrin

alpha-BHC

beta-BHC

delta-BHC

gamma-BHC

Chlordane

DDD

DDE

DDT

Dieldrin

Endosulfan I

Endosulfan II

Endrin

Endrin aldehyde

Heptachlor

Heptachlor epoxide

Isodrin

Kepone

Methoxyclor

Toxaphene

Phenoxyacetic Acid Herbicides 2,4-Dichlorophenoxyacetic acid

Hexachlorodibenzofuran

Pentachlorodibenzo-p-dioxins

Pentachlorodibenzofuran

Tetrachlorodibenzo-p-dioxins
Tetrachlorodibenzofuran

2,3,7,8-Tetrachlorodibenzo-p-dioxin [52 FR 25791, July 8, 1987]

[blocks in formation]

Subpart B-Permit Application

General application requirements. 270.11 Signatories to permit applications and reports.

270.12 Confidentiality of information. 270.13 Contents of Part A of the permit application.

270.14 Contents of Part B: General requirements.

270.15 Specific Part B information requirements for containers.

270.16 Specific Part B information requirements for tank systems.

270.17 Specific Part B information requirements for surface impoundments.

270.18 Specific Part B information requirements for waste piles.

270.19 Specific Part B information requirements for incinerators.

270.20 Specific Part B information requirements for land treatment facilities. 270.21 Specific Part B information requirements for landfills.

[blocks in formation]

and by Pub. L. 96-482; 42 U.S.C. 6091 et seq.). They apply to EPA and to approved States to the extent provided in Part 271.

(2) The regulations in this part cover basic EPA permitting requirements, such as application requirements, standard permit conditions, and monitoring and reporting requirements. These regulations are part of a regulatory scheme implementing RCRA set forth in different parts of the Code of Federal Regulations. The following chart indicates where the regulations implementing RCRA appear in the Code of Federal Regulations.

[blocks in formation]
[blocks in formation]

3004

270.61 Emergency permits.

3005...

270.62 Hazardous waste incinerator permits.

Permit requirements for

3006

3010.....

270.63 Permits for land treatment demonstrations using field test or laboratory analyses.

270.64 Interim permits for UIC wells. 270.65 Research, development, and demonstration permits.

Subpart G-Interim Status

270.70 Qualifying for interim status. 270.71 Operation during interim status. 270.72 Changes during interim status. 270.73 Termination of interim status.

AUTHORITY: 42 U.S.C. 6905, 6912, 6924, 6925, 6927, 6939, and 6974.

SOURCE: 48 FR 14228, Apr. 1, 1983, unless otherwise noted.

Subpart A-General Information

§ 270.1 Purpose and scope of these regulations.

(a) Coverage. (1) These permit regulations establish provisions for the Hazardous Waste Permit Program under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976, as amended (RCRA), (Pub. L. 94-580, as amended by Pub. L. 95-609

[blocks in formation]

RCRA permit program has separate additional Regulations that contain technical requirements. These separate regulations are used by permit issuing authorities to determine what requirements must be placed in permits if they are issued. These separate regulations are located in 40 CFR Parts 264, 266, and 267.

(b) Overview of the RCRA Permit Program. Not later than 90 days after the promulgation or revision of regulations in 40 CFR Part 261 (identifying and listing hazardous wastes) generators and transporters of hazardous waste, and owners or operators of hazardous waste treatment, storage, or disposal facilities may be required to file a notification of that activity under section 3010. Six months after the initial promulgation of the Part 261 regulations, treatment, storage, or disposal of hazardous waste by any

person who has not applied for or received a RCRA permit is prohibited. A RCRA permit application consists of two parts, Part A (see § 270.13) and Part B (see § 270.14 and applicable sections in §§ 270.15 through 270.29). For "existing HWM facilities," the requirement to submit an application is satisfied by submitting only Part A of the permit application until the date the Director sets for submitting Part B of the application. (Part A consists of Forms 1 and 3 of the Consolidated Permit Application Forms.) Timely submission of both notification under section 3010 and Part A qualifies owners and operators of existing HWM facilities (who are required to have a permit) for interim status under section 3005(e) of RCRA. Facility owners and operators with interim status are treated as having been issued a permit until EPA or a State with interim authorization for Phase II or final authorization under Part 271 makes a final determination on the permit application. Facility owners and operators with interim status must comply with interim status standards set forth at 40 CFR Part 265 or with the analagous provisions of a State program which has received interim or final authorization under Part 271. Facility owners and operators with interim status are not relieved from complying with other State requirements. For existing HWM facilities, the Director shall set a date, giving at least six months notice, for submission of Part B of the application. There is no form for Part B of the application; rather, Part B must be submitted in narrative form and contain the information set forth in the applicable sections of §§ 270.14 through 270.29. Owners or operators of new HWM facilities must submit Parts A and B of the permit application at least 180 days before physical construction is expected to commence.

(c) Scope of the RCRA permit requirement. RCRA requires a permit for the "treatment," "storage," and "disposal" of any "hazardous waste" as identified or listed in 40 CFR Part 261. The terms "treatment," "storage," "disposal," and "hazardous waste" are defined in § 270.2. Owners and operators of hazardous waste

management units must have permits during the active life (including the closure period) of the unit. Owners or operators of surface impoundments, landfills, land treatment units, and waste pile units that received wastes after July 26, 1982, or that certified closure (according to § 265.115) after January 26, 1983, must have post-closure permits, unless they demonstrate closure by removal as provided under § 270.1(c) (5) and (6). If a post-closure permit is required, the permit must address applicable Part 264 Groundwater Monitoring, Unsaturated Zone Monitoring, Corrective Action, and Post-closure Care Requirements of this chapter. The denial of a permit for the active life of a hazardous waste management facility or unit does not affect the requirement to obtain a post-closure permit under this section. (1) Specific inclusions. Owners and operators of certain facilities require RCRA permits as well as permits under other programs for certain aspects of the facility operation. RCRA permits are required for:

(i) Injection wells that dispose of hazardous waste, and associated surface facilities that treat, store or dispose of hazardous waste, (See § 270.64). However, the owner and operator with a UIC permit in a State with an approved or promulgated UIC program, will be deemed to have a RCRA permit for the injection well itself if they comply with the requirements of § 270.60(b) (permit-by-rule for injection wells).

(ii) Treatment, storage, or disposal of hazardous waste at facilities requiring an NPDES permit. However, the owner and operator of a publicly owned treatment works receiving hazardous waste will be deemed to have a RCRA permit for that waste if they comply with the requirements of § 270.60(c) for POTWs).

(permit-by-rule

(iii) Barges or vessels that dispose of hazardous waste by ocean disposal and onshore hazardous waste treatment or storage facilities associated with an ocean disposal operation. However, the owner and operator will be deemed to have a RCRA permit for ocean disposal from the barge or vessel itself it they comply with the requirements of

§ 270.60(a) (permit-by-rule for ocean disposal barges and vessels).

(2) Specific exclusions. The following persons are among those who are not required to obtain a RCRA permit:

(i) Generators who accumulate hazardous waste on-site for less than the time periods provided in 40 CFR 262.34.

(ii) Farmers who dispose of hazardous waste pesticides from their own use as provided in § 262.70 of this chapter;

(iii) Persons who own or operate facilities solely for the treatment, storage or disposal of hazardous waste excluded from regulations under this part by 40 CFR 261.4 or 261.5 (small generator exemption).

(iv) Owners or operators of totally enclosed treatment facilities as defined in 40 CFR 260.10.

or

(v) Owners and operators of elementary neutralization units wastewater treatment units as defined in 40 CFR 260.10.

(vi) Transporters storing manifested shipments of hazardous waste in containers meeting the requirements of 40 CFR 262.30 at a transfer facility for a period of ten days or less.

(vii) Persons adding absorbent material to waste in a container (as defined in § 260.10 of this chapter) and persons adding waste to absorbent material in a container, provided that these actions occur at the time waste is first placed in the container; and §§ 264.17(b), 264.171, and 264.172 of this chapter are complied with.

(3) Further exclusions. (i) A person is not required to obtain an RCRA permit for treatment or containment activities taken during immediate response to any of the following situations:

(A) A discharge of a hazardous waste;

(B) An imminent and substantial threat of a discharge of hazardous waste;

(C) A discharge of a material which, when discharged, becomes a hazardous waste.

(ii) Any person who continues or initiates hazardous waste treatment or containment activities after the immediate response is over is subject to all

applicable requirements of this part for those activities.

(4) Permits for less than an entire facility. EPA may issue or deny a permit for one or more units at a facility without simultaneously issuing or denying a permit to all of the units at the facility. The interim status of any unit for which a permit has not been issued or denied is not affected by the issuance or denial of a permit to any other unit at the facility.

(5) Closure by removal. Owners/operators of surface impoundments, land treatment units, and waste piles closing by removal or decontamination under Part 265 standards must obtain a post-closure permit unless they can demonstrate to the Regional Administrator that the closure met the standards for closure by removal or decontamination in § 264.228, § 264.280(e), or § 264.258, respectively. The demonstration may be made in the following ways:

(i) If the owner/operator has submitted a Part B application for a postclosure permit, the owner/operator may request a determination, based on information contained in the application, that section 264 closure by removal standards were met. If the Regional Administrator believes that § 264 standards were met, he/she will notify the public of this proposed decision, allow for public comment, and reach a final determination according to the procedures in paragraph (c)(6) of this section.

(ii) If the owner/operator has not submitted a Part B application for a post-closure permit, the owner/operator may petition the Regional Administrator for a determination that a post-closure permit is not required because the closure met the applicable Part 264 closure standards.

(A) The petition must include data demonstrating that closure by removal or decontamination standards were met, or it must demonstrate that the unit closed under State requirements that met or exceeded the applicable 264 closure-by-removal standard.

(B) The Regional Administrator shall approve or deny the petition according to the procedures outlined in paragraph (c)(6) of this section.

« PreviousContinue »