Professional Construction ManagementMcGraw-Hill, 1984 - 540 pages The subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. Copyright © Libri GmbH. All rights reserved. |
From inside the book
Results 1-3 of 21
Page 429
... loss of use of his existing property , due to fire or otherwise , however caused . If required in writing by any party in interest , the Owner as Trustee shall , upon the occurrence of loss , give bond for the proper performance of his ...
... loss of use of his existing property , due to fire or otherwise , however caused . If required in writing by any party in interest , the Owner as Trustee shall , upon the occurrence of loss , give bond for the proper performance of his ...
Page 450
... loss from the perils of Fire , Extended Coverage , and shall include " All Risk " insurance for physical loss or damage including , without duplication of coverage , at least theft , vandalism , malicious mischief , transit , collapse ...
... loss from the perils of Fire , Extended Coverage , and shall include " All Risk " insurance for physical loss or damage including , without duplication of coverage , at least theft , vandalism , malicious mischief , transit , collapse ...
Page 451
... loss policies carried by the Owner on adjacent properties and under property and consequential loss policies purchased for the Project after its completion 12.6.4 If the policies of insurance referred to in this Paragraph require an ...
... loss policies carried by the Owner on adjacent properties and under property and consequential loss policies purchased for the Project after its completion 12.6.4 If the policies of insurance referred to in this Paragraph require an ...
Contents
Professional Construction Management in | 3 |
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Copyright | |
33 other sections not shown
Other editions - View all
Common terms and phrases
activities activity x actual Agreement alternative applicable approach Architect Architect/Engineer ARTICLE award bar chart basic bid packages bidders budget building Change Order chapter completion concept concrete construction contracts Construction Cost Construction Manager's control system cost code cost engineering CPSR Critical Path Method curve design-construct detail developed drawings economic employees equipment evaluation example facilities factors fair-cost estimate field construction manager Figure finish firms Guaranteed Maximum Price home-office HVAC inspection kg/cm² labor materials ment methods Metier Management Systems negotiated operations organization overall Owner payment percent performance phased construction planning and control preliminary prepared procedures procurement productivity professional construction manager progress project cost Project Manager proposed quality control quantities reports responsibilities safety and health schedule shop drawings standard Structural Structural steel Subcontractor tion Total Trade Contractors unassigned unit Value Engineering