Professional Construction ManagementThe subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. Copyright © Libri GmbH. All rights reserved. |
From inside the book
Results 1-3 of 83
Page 56
The following drawings were prepared by the architect.2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 : Foundation and Floor Plans , and Finish Schedule Drawing A - 2 : Roof Framing , Plan and Details Drawing A - 3 ...
The following drawings were prepared by the architect.2 Drawing SI - 1 : Plot Plan and Utility Plan Drawing A - 1 : Foundation and Floor Plans , and Finish Schedule Drawing A - 2 : Roof Framing , Plan and Details Drawing A - 3 ...
Page 160
Two of the required drawings describe the electrical instrumentation and controls for a crushing and grinding circuit . Since it is similar to one done before , the engineering budget provided for it as follows : 80 design - hours $ 30 ...
Two of the required drawings describe the electrical instrumentation and controls for a crushing and grinding circuit . Since it is similar to one done before , the engineering budget provided for it as follows : 80 design - hours $ 30 ...
Page 412
Engineering Drawings The following drawings were required for the project : Plot Plan and Utility Plan Drawing SI - 1 Drawing A - 1 Drawing A - 2 Drawing A - 3 Drawing PH - 1 Drawing E - 1 Foundation and Floor Plans , and Finish ...
Engineering Drawings The following drawings were required for the project : Plot Plan and Utility Plan Drawing SI - 1 Drawing A - 1 Drawing A - 2 Drawing A - 3 Drawing PH - 1 Drawing E - 1 Foundation and Floor Plans , and Finish ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
Professional Construction Management in | 3 |
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Copyright | |
32 other sections not shown
Other editions - View all
Common terms and phrases
acceptance activities actual additional Agreement alternative amount applicable approach approval Architect associated award basic become bidders budget building changes chapter chart claims Company completion concept concrete considerations contract Contractor cost detail determine developed direct documents drawings economic effect engineering equipment estimate evaluation example facilities factors field Figure final finish firms floor important individual industry inspection involved labor major materials methods needed negotiated objectives operations organization overall Owner packages payment percent performance period phase planning practices preliminary prepared problems procedures procurement productivity professional construction manager progress proposed quantities reasonable reports responsibilities safety savings schedule shows Special specifications standard Structural Subcontractor testing tion Trade unassigned union unit warehouse