Professional Construction ManagementMcGraw-Hill, 1984 - 540 pages The subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. Copyright © Libri GmbH. All rights reserved. |
From inside the book
Results 1-3 of 47
Page 246
... direct and impact costs in more detail . The Effects of Changes1 The effects of changes can be subdivided into three main categories : 1 Direct costs 2 Time extension 3 Impact costs Even the first two can be difficult to assess , and ...
... direct and impact costs in more detail . The Effects of Changes1 The effects of changes can be subdivided into three main categories : 1 Direct costs 2 Time extension 3 Impact costs Even the first two can be difficult to assess , and ...
Page 418
... Direct Cost .12 500.00 1500.00 .32 19800 52800 15000 45000 34800 97800 Sheet Metal Cap Flashing 2.00 3.00 4400 6600 Surface Flashing & Reglet 6.00 5.00 3600 3000 Roof Expansion Joint 20.00 20.00 7000 7000 Roof Hatches 200.00 1000.00 ...
... Direct Cost .12 500.00 1500.00 .32 19800 52800 15000 45000 34800 97800 Sheet Metal Cap Flashing 2.00 3.00 4400 6600 Surface Flashing & Reglet 6.00 5.00 3600 3000 Roof Expansion Joint 20.00 20.00 7000 7000 Roof Hatches 200.00 1000.00 ...
Page 420
... Direct Cost 2810 HR 2080 Metal Partitions & Screens Toilet Partitions 13 EA 100.00 1300 6500 Urinal Screens 7 EA 100.00 700 1300 Direct Cost 70 HR 2000 7800 Glass & Glazing Windows & Doors 600 SF 3.00 1800 1200 Mirrors W / St. / Stl ...
... Direct Cost 2810 HR 2080 Metal Partitions & Screens Toilet Partitions 13 EA 100.00 1300 6500 Urinal Screens 7 EA 100.00 700 1300 Direct Cost 70 HR 2000 7800 Glass & Glazing Windows & Doors 600 SF 3.00 1800 1200 Mirrors W / St. / Stl ...
Contents
Professional Construction Management in | 3 |
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Copyright | |
33 other sections not shown
Other editions - View all
Common terms and phrases
activities activity x actual Agreement alternative applicable approach Architect Architect/Engineer ARTICLE award bar chart basic bid packages bidders budget building Change Order chapter completion concept concrete construction contracts Construction Cost Construction Manager's control system cost code cost engineering CPSR Critical Path Method curve design-construct detail developed drawings economic employees equipment evaluation example facilities factors fair-cost estimate field construction manager Figure finish firms Guaranteed Maximum Price home-office HVAC inspection kg/cm² labor materials ment methods Metier Management Systems negotiated operations organization overall Owner payment percent performance phased construction planning and control preliminary prepared procedures procurement productivity professional construction manager progress project cost Project Manager proposed quality control quantities reports responsibilities safety and health schedule shop drawings standard Structural Structural steel Subcontractor tion Total Trade Contractors unassigned unit Value Engineering