Professional Construction ManagementMcGraw-Hill, 1984 - 540 pages The subjects covered in this book include those normally studied in an introductory overview course on construction management, and there is enough depth and added material to serve as the basis for a more advanced course, focusing on organizational and contractual approaches to project management, and the related planning and control systems. This new edition strengthens its coverage of the business aspects of the industry, with a section devoted solely to the business methods in professional construction management. The text's practical in-depth approach to the major engineering and management techniques appeals to both students and practitioners alike. Copyright © Libri GmbH. All rights reserved. |
From inside the book
Results 1-3 of 32
Page 59
... structural steel contractor . 3 Structural steel Includes furnishing and erection of all structural steel , including the metal roof deck . Does not include miscellaneous steel that is not fully designed at this time . 4 Precast ...
... structural steel contractor . 3 Structural steel Includes furnishing and erection of all structural steel , including the metal roof deck . Does not include miscellaneous steel that is not fully designed at this time . 4 Precast ...
Page 190
... Structural steel Veneer masonry None Warehouse Southeast Aug. 73 / Sept . '74 Private Structural steel Precast None NA No. of elevators DESIGN ... Structural steel Omamental metal Carpentry Waterproofing and dampproofing Roofing and. 190.
... Structural steel Veneer masonry None Warehouse Southeast Aug. 73 / Sept . '74 Private Structural steel Precast None NA No. of elevators DESIGN ... Structural steel Omamental metal Carpentry Waterproofing and dampproofing Roofing and. 190.
Page 194
... Structural Steel Estimate Summary Code Description Quantity Man - hours Units Labor Material Equipment Fabricate in Shop @ 24.00 / Hr Beams & columns 280 Ton 10 Hrs / Ton 240 620 100 Roof joists - purch . 200 Ton 780 Shop overhead ...
... Structural Steel Estimate Summary Code Description Quantity Man - hours Units Labor Material Equipment Fabricate in Shop @ 24.00 / Hr Beams & columns 280 Ton 10 Hrs / Ton 240 620 100 Roof joists - purch . 200 Ton 780 Shop overhead ...
Contents
Professional Construction Management in | 3 |
MANAGEMENT IN PRACTICE | 15 |
Development and Organization of Projects | 18 |
Copyright | |
34 other sections not shown
Other editions - View all
Common terms and phrases
activities activity x actual Agreement alternative applicable approach approval Architect award bar chart basic bid packages bidders budget building change orders Chapter completion concept concrete construction contracts construction cost Construction Manager's construction project contract packages contractor control system cost code cost engineering critical path Critical Path Method curve design-construct detail developed documents drawings earthwork economic equipment evaluation example facilities factors fair-cost estimate field construction manager Figure finish firms Guaranteed Maximum Price home office HVAC important inspection kg/cm² labor lump-sum materials ment methods Mountaintown Warehouse negotiated operations organization overall owner payment percent performance phased construction program plans and specifications prepared procedures productivity professional construction manager progress project cost Project Manager proposed quality control quantities reports responsibilities safety scope standard Structural steel subcontractors summary tion Total unassigned unit utilities Value Engineering