Public Library Buildings: Their Financing, Design, Construction, Equipment and OperationMary O. McComb, 1935 - 325 pages |
From inside the book
Results 1-3 of 32
Page 41
... pipe , of iron pipe sizes , for hot and cold water pipe beneath floors and in the walls of a building . Brass and copper pipe cost from ten to twenty percent more than genuine wrought iron pipe , and about twenty to forty percent more ...
... pipe , of iron pipe sizes , for hot and cold water pipe beneath floors and in the walls of a building . Brass and copper pipe cost from ten to twenty percent more than genuine wrought iron pipe , and about twenty to forty percent more ...
Page 266
... pipe . 3405. SOIL PIPE , FITTINGS AND CONNECTIONS . All soil , waste , vent , and drain piping in the building below basement floor or ground and outside of building below ground , including the main connection from the building to the ...
... pipe . 3405. SOIL PIPE , FITTINGS AND CONNECTIONS . All soil , waste , vent , and drain piping in the building below basement floor or ground and outside of building below ground , including the main connection from the building to the ...
Page 267
... pipe must be marked with the trade - mark of the manufacturer , and all brass pipe with grade letter " A. " Nipples shall be of the same material and composition as the pipe furnished . Fittings and couplings for brass and copper water ...
... pipe must be marked with the trade - mark of the manufacturer , and all brass pipe with grade letter " A. " Nipples shall be of the same material and composition as the pipe furnished . Fittings and couplings for brass and copper water ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron