Public Library Buildings: Their Financing, Design, Construction, Equipment and OperationMary O. McComb, 1935 - 325 pages |
From inside the book
Results 1-3 of 43
Page 45
... Light an illuminating engineer was loaned to the Library , scien- tific tests were made - and the system was found to be only twenty - three per- cent efficient ; the other seventy - seven percent of light expending itself within the ...
... Light an illuminating engineer was loaned to the Library , scien- tific tests were made - and the system was found to be only twenty - three per- cent efficient ; the other seventy - seven percent of light expending itself within the ...
Page 67
... lights left burning during the daytime by careless attendants . Stack light switches should be operated exclusively from the panel boards . Each individ- ual stack light fixture should be provided with a pull chain . Strict regulations ...
... lights left burning during the daytime by careless attendants . Stack light switches should be operated exclusively from the panel boards . Each individ- ual stack light fixture should be provided with a pull chain . Strict regulations ...
Page 318
... light the pilot light in each firebox . ( If pilot lights are already burning , it is not necessary to shut valves off and relight them . ) ( 3 ) Open the red - painted master valve on the fuel line leading to the furnaces . If oil ...
... light the pilot light in each firebox . ( If pilot lights are already burning , it is not necessary to shut valves off and relight them . ) ( 3 ) Open the red - painted master valve on the fuel line leading to the furnaces . If oil ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron