... CHANGES IN THE WORK . Even tho the utmost care and forethought may have been observed in planning the building and ... changes shall be made " with or without notice thereof to the surety company ; " in other words , the lat- ter ...
... CHANGES IN THE WORK . Even tho the utmost care and forethought may have been observed in planning the building and ... changes shall be made " with or without notice thereof to the surety company ; " in other words , the lat- ter ...
Page 88
... changes in the quantity , or in the quality , or even the kind of material itself which must be used in order to conform to the required standards . Supplementary agreements between the owner and the contractor , involving price changes ...
... changes in the quantity , or in the quality , or even the kind of material itself which must be used in order to conform to the required standards . Supplementary agreements between the owner and the contractor , involving price changes ...
Page 102
... changes , increasing or diminishing the quantities to be purchased , with a proportional increase or reduction in the contract price . In the preceding chapter it was pointed out that the power to make such changes should be limited to ...
... changes , increasing or diminishing the quantities to be purchased , with a proportional increase or reduction in the contract price . In the preceding chapter it was pointed out that the power to make such changes should be limited to ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron