Page 46
... building ; pour the concrete of the steps si- multaneously and monolithically with that of the building ; and be sure in the design of the building that the unit pressure per square foot of area for the foundation of the steps is the ...
... building ; pour the concrete of the steps si- multaneously and monolithically with that of the building ; and be sure in the design of the building that the unit pressure per square foot of area for the foundation of the steps is the ...
Page 60
... building . The incinerator should be located in- side the building , in the basement where such basement exists , connected with the flue of the heating plant , and provided with a door on each - basement and first floor . A simple ...
... building . The incinerator should be located in- side the building , in the basement where such basement exists , connected with the flue of the heating plant , and provided with a door on each - basement and first floor . A simple ...
Page 183
... building . C. To prepare general and detail plans of the building sufficiently full and complete to indi- cate clearly to the contractor all necessary work to be done , in accordance with such plans ; also in accordance with the ...
... building . C. To prepare general and detail plans of the building sufficiently full and complete to indi- cate clearly to the contractor all necessary work to be done , in accordance with such plans ; also in accordance with the ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron