Public Library Buildings: Their Financing, Design, Construction, Equipment and OperationMary O. McComb, 1935 - 325 pages |
From inside the book
Results 1-3 of 46
Page 80
... bonds has been discussed upon the basis of surety companies regularly incorporated for this particular purpose . It is possible , as well as perfectly lawful , that the bond be furnished by private individuals , usually two or more of ...
... bonds has been discussed upon the basis of surety companies regularly incorporated for this particular purpose . It is possible , as well as perfectly lawful , that the bond be furnished by private individuals , usually two or more of ...
Page 181
... BOND CAMPAIGN OF 1921. The Board of Commissioners asked the City Council to put on a bond campaign of $ 3,750,000.00 . This was cut by the City Council to $ 2,500,000.00 and placed on the calendar of June 7 , 1921 at a special election ...
... BOND CAMPAIGN OF 1921. The Board of Commissioners asked the City Council to put on a bond campaign of $ 3,750,000.00 . This was cut by the City Council to $ 2,500,000.00 and placed on the calendar of June 7 , 1921 at a special election ...
Page 208
... bond must not be prior to the date of the instrument for which it is given . 2. The signature of a witness , attesting the signature of each individual party to the bond , shall appear in the appropriate place . 3. - If the Principal or ...
... bond must not be prior to the date of the instrument for which it is given . 2. The signature of a witness , attesting the signature of each individual party to the bond , shall appear in the appropriate place . 3. - If the Principal or ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron