... Contractors . 915 . Protection of Work and Property . 934 . 916 . 935 . Mutual Responsibility of Contractors . Separate Contracts . 917 . Fire Insurance . 936 . Assignments . 918 . Guaranty Bonds . Contractor's Liability Insurance . 919 ...
... Contractors . 915 . Protection of Work and Property . 934 . 916 . 935 . Mutual Responsibility of Contractors . Separate Contracts . 917 . Fire Insurance . 936 . Assignments . 918 . Guaranty Bonds . Contractor's Liability Insurance . 919 ...
Page 212
... Contractor , free of charge , all copies of drawings and specifications reasonably necessary for the execution of the work . 905. SHOP DRAWINGS . The Contractor shall submit , with such promptness as to cause no delay in his own work or ...
... Contractor , free of charge , all copies of drawings and specifications reasonably necessary for the execution of the work . 905. SHOP DRAWINGS . The Contractor shall submit , with such promptness as to cause no delay in his own work or ...
Page 215
... contractor save with the consent of the Architect . 930. DELAYS . If the Contractor be delayed in the completion of the work by any act or neg- lect of the Board or the Architect , or of any employee of either , or by any other contractor ...
... contractor save with the consent of the Architect . 930. DELAYS . If the Contractor be delayed in the completion of the work by any act or neg- lect of the Board or the Architect , or of any employee of either , or by any other contractor ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron