Public Library Buildings: Their Financing, Design, Construction, Equipment and OperationMary O. McComb, 1935 - 325 pages |
From inside the book
Results 1-3 of 84
Page 29
... architect the author is reminded of a protegee of a nationally famous designer of public libraries in America ; young , energetic , enthusiastic , filled to bursting with scintillant but untried ideas as to library design , commissioned ...
... architect the author is reminded of a protegee of a nationally famous designer of public libraries in America ; young , energetic , enthusiastic , filled to bursting with scintillant but untried ideas as to library design , commissioned ...
Page 212
... Architect shall have authority to make minor changes in the work not involving extra cost to the Owner and not inconsistent with the purpose of the building . 904. COPIES FURNISHED . The Architect will furnish to the Contractor , free ...
... Architect shall have authority to make minor changes in the work not involving extra cost to the Owner and not inconsistent with the purpose of the building . 904. COPIES FURNISHED . The Architect will furnish to the Contractor , free ...
Page 215
... Architect shall decide to justify the delay , then the time of completion shall be extended for such reasonable time as the Architect may decide . No such extension shall be made for delay occurring more than seven days before claim ...
... Architect shall decide to justify the delay , then the time of completion shall be extended for such reasonable time as the Architect may decide . No such extension shall be made for delay occurring more than seven days before claim ...
Contents
Chapter II Design | 28 |
Fullsize Details and Shop | 36 |
Prevention of Damage from | 42 |
10 other sections not shown
Common terms and phrases
approved Architect asphalt base basement bidder Board bond brass brick cabinet ceiling cement charging desk clean coat color complete concrete condition construction contract Contractor cork cork carpet corporation cost creosote oil doors drawings edges electric equipment exterior fastened feet finish fixtures flanged floor covering furnace Furnish and install furniture gate valve glass hardware heating holes inches inches high inches wide indicated iron joints joist less Librarian linoleum linseed oil marble masonry material metal mortar mortise and tenon necessary operation Owner paint panel Paragraph Subject Paris green permit pipe plaster Plate plumbing Portland cement proper proposal putty quarter-sawn reading rooms roof samples sand sash Section secure shelf shop drawings shown space specifications square stack steel submitted surface termites terra cotta terrazzo thoroly thru tile tion valve varnish vent wall shelving waterproofing wood wood block workmanship wrought iron