... removed from the channel between the piers , and both piers were repaired during the year . Amount available July 1 , 1871 .... Allotted during the year for repairs Amount expended during the fiscal year ending June 30 , 1872 .... Part ...
... removed from the channel between the piers , and both piers were repaired during the year . Amount available July 1 , 1871 .... Allotted during the year for repairs Amount expended during the fiscal year ending June 30 , 1872 .... Part ...
Page 53
... removing snags and cutting timber from the banks . Two parties were engaged from July to December , and it is estimated fully half the obstructions have been removed . A survey was made for lock and dam improvement as high up as Camden ...
... removing snags and cutting timber from the banks . Two parties were engaged from July to December , and it is estimated fully half the obstructions have been removed . A survey was made for lock and dam improvement as high up as Camden ...
Page 65
... removal , to a depth of 25 feet mean low water , of the wreck of the Monitor Patapsco , near Fort Sumter . At the ... removing the following wrecks : 1. A wreck near Fort Sumter to a depth of 27 feet at mean low water . 2. The Monitor ...
... removal , to a depth of 25 feet mean low water , of the wreck of the Monitor Patapsco , near Fort Sumter . At the ... removing the following wrecks : 1. A wreck near Fort Sumter to a depth of 27 feet at mean low water . 2. The Monitor ...
Page 69
... removed . It is proposed to expend the appropriation of $ 15,000 of June 10 , 1872 , in extending the channels already dredged , and in building dikes , with the double object of contracting the water - way and increasing the flow ...
... removed . It is proposed to expend the appropriation of $ 15,000 of June 10 , 1872 , in extending the channels already dredged , and in building dikes , with the double object of contracting the water - way and increasing the flow ...
Page 76
... removed from mid - channel , a short distance above Third street bridge . It is proposed to expend the appropriation of June 10 , 1872 , in dredg- ing the channel below mouth of Brandywine Creek , between Third and Market streets , and ...
... removed from mid - channel , a short distance above Third street bridge . It is proposed to expend the appropriation of June 10 , 1872 , in dredg- ing the channel below mouth of Brandywine Creek , between Third and Market streets , and ...
Other editions - View all
Common terms and phrases
12 feet act of June Amount appropriated Amount available July Amount expended Amount required Appendix appropriated by act bank boats bottom breakwater Brigadier-General canal cents channel Chattahoochee River Chief of Engineers Choctawhatchee River commenced completed construction contract Corps of Engineers cost Creek cribs cubic yards depth of water dike distance dredging ending June 30 ENGINEER OFFICE estimate excavation feet long feet of water feet wide fiscal year ending foot gravel harbor improvement inches Island John's River Lake locks mean low water miles Mississippi Mobile Mobile River mouth Muscle Shoals navigation obedient servant obstructions pier piles port portion pounds present proposed protection Railroad removed repairs respectfully riprap river Roanoke River rock Saint Louis Saint Louis River sand season Shoals shore snags steamers stone stream submitted survey timber tion Total United States Army UNITED STATES ENGINEER vessels west pier width
Popular passages
Page 442 - ... and located in a part of the bridge that can be safely and conveniently reached at that stage; and that said draw shall be opened promptly, upon reasonable signal, for the passage of boats...
Page 161 - Very respectfully, your obedient servant, AA HUMPHREYS, Brigadier General and Chief of Engineers.
Page 56 - Mexico, to be completed within twenty years; of the Mississippi River between the mouth of the Missouri and the mouth of the Ohio River...
Page 443 - ... mile above and one mile below the proposed location, the topography of the banks of the river, the shore-lines at high and low water, the direction and strength of the currents at all stages, and the soundings, accurately showing the bed of the stream...
Page 443 - ... the location of any other bridge or bridges, and shall furnish such other information as may be required for a full and satisfactory understanding of the subject; And until the said plan and location of the bridge are approved by the Secretary of War...
Page 547 - Occasionally bluffs and hills extend down to the river, and then the country opens out again, first on one side of the river and then on the other side.
Page 543 - GENERAL : In compliance with your instructions I have the honor to submit the following report of the...
Page 29 - ... with a statement showing the amount expended during the fiscal year, and the amount that can be profitably expended during the next fiscal year, is submitted herewith. For more detailed information in regard to the improvements, and for the results of the surveys and examinations ordered by Congress, and not found in...
Page 263 - There is a light-house exhibiting a fixed white light of the third order, and a beacon on the outer end of the pier showing a fixed white light of the fourth order. The amount of revenue collected at this port during the fiscal year was $1,006,172.60.
Page 720 - Kiver, at the confluence of the two branches known as the Southern and Eastern. The advantages which the city enjoys as a sea-port are too well known to need more than a passing notice here. Her central position on the Atlantic sea-board; her mild climate, and consequent freedom from obstructions to navigation from ice, and her facilities for communication with a fertile and productive interior, give her natural advantages almost unsurpassed. The harbor proper, (or that portion of the river opposite...