Congressional Serial SetU.S. Government Printing Office, 1874 |
From inside the book
Results 1-5 of 100
Page 5
... portions to resist the heavy rifled shot . The eathern parts of modern fortifications have assumed such exten- sive proportions that they are no longer capable of being thrown up and constructed in short and limited periods , while the ...
... portions to resist the heavy rifled shot . The eathern parts of modern fortifications have assumed such exten- sive proportions that they are no longer capable of being thrown up and constructed in short and limited periods , while the ...
Page 11
... portion extending over parapet ; traverse - magazine No. 2 has been built , cov- ered with mastic , and partly covered with sand ; a small part of breast- height wall has been built . On the northeast front , the parade - wall has been ...
... portion extending over parapet ; traverse - magazine No. 2 has been built , cov- ered with mastic , and partly covered with sand ; a small part of breast- height wall has been built . On the northeast front , the parade - wall has been ...
Page 13
... portion of the masonry of the work requires pointing . It has never been pointed . No appropriation was made for the fiscal year ending June 30 , 1875 . Appropriation asked next fiscal year ...... ..... $ 7,000 Fort on site of Fort ...
... portion of the masonry of the work requires pointing . It has never been pointed . No appropriation was made for the fiscal year ending June 30 , 1875 . Appropriation asked next fiscal year ...... ..... $ 7,000 Fort on site of Fort ...
Page 24
... portion finished save coping . On face running northwest the wall is completed 196 feet from angle , and an ad ... portions of the work , have been thoroughly repaired . A new locomotive has been purchased , most of the freight - cars ...
... portion finished save coping . On face running northwest the wall is completed 196 feet from angle , and an ad ... portions of the work , have been thoroughly repaired . A new locomotive has been purchased , most of the freight - cars ...
Page 39
... portion of this sum in using the dredge at Ahnapee Harbor , ( the cost of the dredge having been paid for equally out of the appropriations for these two harbors , ) it will not be practicable to extend the piers this season , though ...
... portion of this sum in using the dredge at Ahnapee Harbor , ( the cost of the dredge having been paid for equally out of the appropriations for these two harbors , ) it will not be practicable to extend the piers this season , though ...
Other editions - View all
Common terms and phrases
act approved June Amount appropriated Amount available July Amount expended Amount in hands Amount required Appendix appropriated by act approved June 23 Balance in Treasury Bayou board of engineers board-measure boats breakwater bridge built canal cents channel Cheat River Chief of Engineers commenced completed construction contract Corps of Engineers cost Crabtree Creek cribs cubic feet cubic yards Deep Creek depth Detroit River dike distance dredging ending June 30 estimate excavation feet wide fiscal year ending foot gate hands of officer harbor height improvement inches Island Lake length levee low water low-water lower masonry miles Mississippi River mouth navigation north pier obstruction officer and subject Ohio Ohio River opening pass pool proposed railroad removed repairs riprap rock route sand Savage River season Shoals steamers stone summit-level superstructure survey tons Total Treasury of United tunnel United States July upper vessels weir west pier wickets width Yonne Youghiogheny
Popular passages
Page 565 - That any bridge authorized to be constructed under this act shall be built and located under and subject to euch regulations for the security of navigation of said river as the Secretary of War shall prescribe...
Page 484 - An Act to procure the necessary surveys, plans, and estimates upon the subject of roads and canals." It authorized the President to cause surveys and estimates to be made of the routes of such roads and canals...
Page 141 - Ocean, the first thing which strikes us is, that, the north-east and south-east monsoons, which are found the one on the north and the other on...
Page 380 - Congress directing the topographical and hydrographical survey of the delta of the Mississippi River, with such investigations as might lead to determine the most practicable plan for securing it from inundation, and the best mode of deepening the channels at the mouths of the river.
Page 625 - And in case of any litigation arising from any obstruction or alleged obstruction to the free navigation of said river, the cause may be tried before the district court of the United States of any State in which any portion of said obstruction or bridge touches.
Page 560 - WeitzePs report is to be found at page 463 of the Annual Report of the Chief of Engineers for the fiscal year ending June 30, 1872.
Page 202 - The United States may construct works for the improvement or security of a given harbor, or as a shelter for ships from storms, or in time of war, and they may interpose for the conservation of said works, or to guard against any diminution of the existing advantages of a river, lake, or sea by the usurpation of individuals, or even of a sovereign State of the Union. But so also iu my judgment may that State itself.
Page 324 - ... for the improvement of the Mississippi River between the mouths of the Illinois and Ohio Rivers, the distribution of the sum to be at the discretion of the Chief of Engineers.
Page 34 - ... Commonwealth, having immediate cognizance of the crime with which such prisoner is charged, or of the court by which such prisoner has been convicted, to appoint a commission of three citizens of this Commonwealth, of whom one shall be of the profession of medicine, and one of the profession of law, whose duty it shall be to inquire into and report upon the mental condition of such prisoner ; and if, in a report signed by a majority or all of the members of such commission, it shall appear that...
Page 625 - ... mark, as understood at the point of location, to the bottom chord of the bridge, nor shall the spans of said bridge be less than two hundred and fifty feet in length, and the piers of said bridge shall be parallel with the current of said river...